29 minutes | 0.5 PDH/LU
Featuring Jereme Montgomery from Stephens & Smith Construction Co. Inc., this presentation covers #ConcreteTough, a Nebraska based workforce recruiting/workforce development campaign for concrete careers. Even though it started in Nebraska, participants of this webinar will hear the steps we ...
45 minutes
Design and construction professionals face significant challenges driven by increasing customer demands, rapidly changing material costs, strained supply chains, and the loss of workers going into trades. However, a more urgent issue is that climate change is a real and growing concern. Given t...
49 minutes | 1 PDH/LU
The average weight of the tilt-up panel has increased greatly over recent years. It is critically important to understand crane ground bearing pressure and ensure that the subgrade can support these loads at all times. This seminar will discuss factors affecting crane selection, the process fo...
36 minutes | 1 PDH/LU
This seminar presents a general introduction of thin brick veneer and the tilt-up process, including a brief history with successful installation examples. Explanation of the product and code compliance based on tilt-up standards and compatible form liners as well as design capabilities with thin...
92 minutes | 2 PDH/LU
We all know that the big day on a tilt-up job is the day that panel lifting commences. It is also one of the most critical events in time where all safety practices and procedures are adhered to in order to assure everyone's well being, and to provide the customer with the confidence in you, as w...
60 minutes
Featuring Julia Kunlo of Evolution Safety Resources, this webinar is available to TCA members and will discuss the recent announcement by OSHA categorizing COVID-19 as a recordable illness for OSHA 300 logs and the expectations this places on employers. Learn from Ms. Kunlo about the truths for t...
47 minutes | 1 PDH/LU
Project Dylan is a new prototype fulfillment center. The warehouse building has an approx. footprint of 700,000 SF slab on grade and another 1.95 million SF of elevated deck. The exterior is clad with 330,000 SF of insulated tilt-up panels. The panels are non-load bearing for gravity but as a VE ...
42 minutes
This talk centers around the success Martin Concrete Construction has had with a bottom-up approach to safety culture. Specifically, this talk will discuss the benefits of hiring bilingual staff and how that practice has enhanced culture and communication. Additionally, we will review safety prog...
60 minutes | 1 PDH/LU
Tilt-up technology continues to advance at lightning speed. Each year, there are developments of equipment capability, breakthroughs in concrete science – panels expand in size, structural connections become more sophisticated, and finishing options multiply. With each industry advancement,...
46 minutes | 1 PDH/LU
Because of the casting and erection process of tilt-up construction, surface irregularities and aesthetic imperfections in the exposed surfaces are common. These conditions include spalls, gouges, cracks, dents, chips, bug holes and honeycombs. Such imperfections may occur on exterior or inter...
44 minutes | 1 PDH/LU
The TCA Cyber Round Table has become THE trusted resource for TCA members to get their urgent technical questions answered by a community of tilt-up industry experts in design and construction. In this presentation, David and Erik will review the best questions submitted to the Cyber Round Table ...
35 minutes | 1 PDH/LU
This presentation will discuss the origins of tilt-up bondbreaker and its evolution over the years to the products we use today. The discussion will also cover proper application techniques, troubleshooting potential issues, and ways to maximize efficiency and profitability.
18 minutes | 0.5 PDH/LU
This seminar introduces the six modules consisting of the content for preparation to the ACI/TCA Tilt-Up Technician Certification Exam and the industry’s broad certification efforts as well as discussing the primary components contributing to the strategic and impressive growth of tilt-up c...
16 minutes | 0.5 PDH/LU
This session is part 1 of 6 modules discussing the construction process known as tilt-up or tilt wall, covering aspects important to the knowledge base for preparation to the ACI/TCA Tilt-Up Technician Certification Exam. This module covers safety communications and procedures, planning the tilt-...
11 minutes | 0.5 PDH/LU
This session is part 2 of 6 modules discussing the construction process known as tilt-up or tilt wall, covering aspects important to the knowledge base for preparation to the ACI/TCA Tilt-Up Technician Certification Exam. This module covers the initial steps involved in starting a tilt-up project...
13 minutes | 0.5 PDH/LU
This session is part 3 of 6 modules discussing the construction process known as tilt-up or tilt wall, covering aspects important to the knowledge base for preparation to the ACI/TCA Tilt-Up Technician Certification Exam. This module covers the steps to lay out and complete the forming of tilt-up...
19 minutes | 0.5 PDH/LU
This session is part 4 of 6 modules discussing the construction process known as tilt-up or tilt wall, covering aspects important to the knowledge base for preparation to the ACI/TCA Tilt-Up Technician Certification Exam. This module covers the properties of concrete specific to tilt-up construct...
13 minutes | 0.5 PDH/LU
This session is part 5 of 6 modules discussing the construction process known as tilt-up or tilt wall, covering aspects important to the knowledge base for preparation to the ACI/TCA Tilt-Up Technician Certification Exam. This module the processes of erecting and bracing tilt-up panels, widely co...
17 minutes | 0.5 PDH/LU
This session is the final, part 6 of 6 modules discussing the construction process known as tilt-up or tilt wall, covering aspects important to the knowledge base for preparation to the ACI/TCA Tilt-Up Technician Certification Exam. This module detail many of the options for panel finishes and th...
80 minutes | 1.5 PDH/LU
Session 2 will consist of three talks concerning ideas and technologies related to workforce issues. These talks will be followed by a panel discussion reflecting on their potential impact.
Remote or Hand Free Load Orientation Technology
Verton has developed the...
55 minutes | 1 PDH/LU
Session 3 will features updates from two previous Tilt-Up Future Think participants who will discuss advancements, real-world applications, and adoption. Technologies featured include Helix Steel and CarbonCure.
54 minutes
With the increased demand for energy-efficient buildings comes the need for insulated tilt-up sandwich panels. This seminar aims to increase familiarity with the most advanced insulated tilt-up sandwich panels on the market and the methods used to construct them. As insulated panels come with dif...
39 minutes | 1 PDH/LU
Tilt-up construction is revered as one of the most broadly applied construction systems. Part of the attraction is the palette of high-end finishes that continues to grow in all regions. Design and construction professionals not only must recognize the wide range of finishes and techniques that a...
30 minutes
With the advances in concrete technology over the last 50 years, why is slump still being mandated in project specifications? This presentation will begin by covering the history of the slump test and the development of the water/cement ratio. Then we will discuss the advent of water-reducing adm...
Achieving Net Zero Energy with Tilt Wall
50 minutes
We’ve moved on from a time when small consumer decisions like using compostable straws could be considered an adequate response to address climate...
Why is Slump Mandated in Project Specifications?
30 minutes
With the advances in concrete technology over the last 50 years, why is slump still being mandated in project specifications? This presentation will begin...
Better Materials, Better Designs, Better Ways to Build with Concrete
45 minutes
Design and construction professionals face significant challenges driven by increasing customer demands, rapidly changing material costs, strained supply...
Structural Engineering Challenges While Designing Tilt-Up Structures
53 minutes
This seminar will speak to of the challenges of structural design in tilt ups. Joining me in this presentation will include John Lawson, S.E. Together...
Building Psychological Safety to Address Mental Health
51 minutes
After two years, the stresses of a global pandemic have compounded the existing mental health challenges in the construction industry. According...
56 minutes
Needham DBS was called to investigate cracks on a building after years of issues. The building had a history of failed panel to slab connections and significant...
A Parametric Study of the New Diaphragm Design Force Methods
55 minutes
Since its introduction into U.S. building codes and standards, a single generally-accepted method has existed for determining seismic design forces on...
Safety Success through Proper Communication
42 minutes
This talk centers around the success Martin Concrete Construction has had with a bottom-up approach to safety culture. Specifically, this talk will discuss...
The Evolution of Bondbreaker: History, Best Practices, and Troubleshooting
35 minutes
This presentation will discuss the origins of tilt-up bondbreaker and its evolution over the years to the products we use today. The discussion will also...
Obstacles Facing Tomorrow’s Leaders Today
53 minutes
This panel discussion, led by TCA’s Tilt-Up Industry Leaders of Tomorrow (TILT), will explore how tomorrow’s leaders approach the daily challenges...