Continuing education credits for this course are currently unavailable. While you are welcome to view the course, credits will not be applied.
Stream world-class tilt-up education and training with an all-access subscription - just $17/month.
Already a subscriber? Login to access your content.
Duration: 50 minutes
Speaker: Jesse Hunt
We’ve moved on from a time when small consumer decisions like using compostable straws could be considered an adequate response to address climate concerns. The stakes are high and the market is responding. In the wake of the pandemic, there is now unprecedented pressure on businesses across all industries to embed sustainability as a feature, not just a bug. If you are a company that owns, develops, designs, or builds warehouse structures and are concerned with improving your ESG reporting, there is some untapped low-hanging fruit. Many of these structures consume relatively small amounts of energy that can efficiently and economically be offset through good design, quality building systems, and attention to construction details. This seminar will discuss strategies for achieve net-zero energy with tilt wall.
Achieving Net Zero Energy with Tilt Wall
50 minutes
We’ve moved on from a time when small consumer decisions like using compostable straws could be considered an adequate response to address climate...
Why is Slump Mandated in Project Specifications?
30 minutes
With the advances in concrete technology over the last 50 years, why is slump still being mandated in project specifications? This presentation will begin...
Better Materials, Better Designs, Better Ways to Build with Concrete
45 minutes
Design and construction professionals face significant challenges driven by increasing customer demands, rapidly changing material costs, strained supply...
Structural Engineering Challenges While Designing Tilt-Up Structures
53 minutes
This seminar will speak to of the challenges of structural design in tilt ups. Joining me in this presentation will include John Lawson, S.E. Together...
Building Psychological Safety to Address Mental Health
51 minutes | 1 PDH/LU
After two years, the stresses of a global pandemic have compounded the existing mental health challenges in the construction industry. According...
56 minutes | 1 PDH/LU
Needham DBS was called to investigate cracks on a building after years of issues. The building had a history of failed panel to slab connections and significant...
A Parametric Study of the New Diaphragm Design Force Methods
55 minutes | 1 PDH/LU
Since its introduction into U.S. building codes and standards, a single generally-accepted method has existed for determining seismic design forces on...
Safety Success through Proper Communication
42 minutes
This talk centers around the success Martin Concrete Construction has had with a bottom-up approach to safety culture. Specifically, this talk will discuss...
The Evolution of Bondbreaker: History, Best Practices, and Troubleshooting
35 minutes | 1 PDH/LU
This presentation will discuss the origins of tilt-up bondbreaker and its evolution over the years to the products we use today. The discussion will also...
Obstacles Facing Tomorrow’s Leaders Today
53 minutes
This panel discussion, led by TCA’s Tilt-Up Industry Leaders of Tomorrow (TILT), will explore how tomorrow’s leaders approach the daily challenges...