Duration: 47 minutes
Speakers: Barclay Gebel, FTCA | Karen S. Hand, PE, FTCA
Project Dylan is a new prototype fulfillment center. The warehouse building has an approx. footprint of 700,000 SF slab on grade and another 1.95 million SF of elevated deck. The exterior is clad with 330,000 SF of insulated tilt-up panels. The panels are non-load bearing for gravity but as a VE alternate on the project, the panels do carry large shear forces for seismic loading. With the tallest panel standing at 81ft - 1in tall, Concrete Strategies (CSI) set a company record for the tallest tilt-up panel ever erected on a project and an industry record for the tallest composite panel ever constructed. This was accomplished utilizing an innovative composite panel design by Needham DBS. Meadow Burke introduced the Super 62 which was used on this project. The composite panel industry is on the frontier of emerging design technologies, the innovation is ripe to propel our industry into the future.
Complimentary content provided by IconX, LLC. Tilt-Up Academy subscribers must login for credit to be applied to their account.
Credits: 1 PDH/LU
Provider: Tilt-Up Concrete Association
Once you have completed the course, you may take the quiz for course credit. Credits will be posted to your member profile within one week once a grade of at least 70% is achieved.