Stream world-class tilt-up education and training with an all-access subscription - just $17/month.
Already a subscriber? Login to access your content.
Duration: 56 minutes
Speaker: Karen S. Hand, PE
Needham DBS was called to investigate cracks on a building after years of issues. The building had a history of failed panel to slab connections and significant bowing in the panels. At the onset of the investigation, the mindset was that either the interior slab was moving, or the exterior paving was moving, causing the dock panel to slab on grade connection to receive a tension force large enough to fail the connections. This presentation will discuss the investigative approach and process for conducting root cause analysis as well as strategies for mitigating external loads on panels.
Credits: 1 PDH/LU
Provider: Tilt-Up Concrete Association
Achieving Net Zero Energy with Tilt Wall
50 minutes
We’ve moved on from a time when small consumer decisions like using compostable straws could be considered an adequate response to address climate...
Why is Slump Mandated in Project Specifications?
30 minutes
With the advances in concrete technology over the last 50 years, why is slump still being mandated in project specifications? This presentation will begin...
Better Materials, Better Designs, Better Ways to Build with Concrete
45 minutes
Design and construction professionals face significant challenges driven by increasing customer demands, rapidly changing material costs, strained supply...
Structural Engineering Challenges While Designing Tilt-Up Structures
53 minutes
This seminar will speak to of the challenges of structural design in tilt ups. Joining me in this presentation will include John Lawson, S.E. Together...
Building Psychological Safety to Address Mental Health
51 minutes | 1 PDH/LU
After two years, the stresses of a global pandemic have compounded the existing mental health challenges in the construction industry. According...
56 minutes | 1 PDH/LU
Needham DBS was called to investigate cracks on a building after years of issues. The building had a history of failed panel to slab connections and significant...
A Parametric Study of the New Diaphragm Design Force Methods
55 minutes | 1 PDH/LU
Since its introduction into U.S. building codes and standards, a single generally-accepted method has existed for determining seismic design forces on...
Safety Success through Proper Communication
42 minutes
This talk centers around the success Martin Concrete Construction has had with a bottom-up approach to safety culture. Specifically, this talk will discuss...
The Evolution of Bondbreaker: History, Best Practices, and Troubleshooting
35 minutes | 1 PDH/LU
This presentation will discuss the origins of tilt-up bondbreaker and its evolution over the years to the products we use today. The discussion will also...
Obstacles Facing Tomorrow’s Leaders Today
53 minutes
This panel discussion, led by TCA’s Tilt-Up Industry Leaders of Tomorrow (TILT), will explore how tomorrow’s leaders approach the daily challenges...