Duration: 1 minute
YP volunteers to chair a new committee in episode 4, but Adult questions her commitment.
Directed by Jacob Moyer
Written and Produced by Mitch Bloomquist
Generational Consultant, Amy Lynch
Adult - Patrick Albanese
Young Professional - McKenzie Paulsen
YP is a young and hip female working to make a difference but struggling understand her place. Adult is a middle-aged man at the top of the corporate ladder just trying to keep things on track. Both fulfill every generational stereotype and are frustrated with each other’s fickle dispositions. Nonetheless, they continue to be surprised and encouraged by their shared interest in their professional organization. More at tilt-up.org/generations. All content copyright Tilt-Up Concrete Association 2020.
Beneath the Surface - The Art of Exposed Aggregate
NEW 37 minutes | 0.5 PDH/LU
This film takes an inside look at the craft of exposed aggregate tilt-up panels, following the process from the job site to completed buildings. Led...
9 minutes
An investigation into the interplay of local materials and form, this project examines the inherent qualities of soil and rock as formative elements...
Achieving Net Zero Energy with Tilt Wall
50 minutes
We’ve moved on from a time when small consumer decisions like using compostable straws could be considered an adequate response to address climate...
Why is Slump Mandated in Project Specifications?
30 minutes
With the advances in concrete technology over the last 50 years, why is slump still being mandated in project specifications? This presentation will begin...
Better Materials, Better Designs, Better Ways to Build with Concrete
45 minutes
Design and construction professionals face significant challenges driven by increasing customer demands, rapidly changing material costs, strained supply...
Structural Engineering Challenges While Designing Tilt-Up Structures
53 minutes
This seminar will speak to of the challenges of structural design in tilt ups. Joining me in this presentation will include John Lawson, S.E. Together...
Building Psychological Safety to Address Mental Health
51 minutes | 1 PDH/LU
After two years, the stresses of a global pandemic have compounded the existing mental health challenges in the construction industry. According...
56 minutes | 1 PDH/LU
Needham DBS was called to investigate cracks on a building after years of issues. The building had a history of failed panel to slab connections and significant...
A Parametric Study of the New Diaphragm Design Force Methods
55 minutes | 1 PDH/LU
Since its introduction into U.S. building codes and standards, a single generally-accepted method has existed for determining seismic design forces on...
Safety Success through Proper Communication
42 minutes
This talk centers around the success Martin Concrete Construction has had with a bottom-up approach to safety culture. Specifically, this talk will discuss...