• Case Studies

    Before the Building

    Before any walls could be lifted, the Haas Automation campus in Henderson, Nevada required the transformation of a steep desert site into a level, buildable platform. Through extensive regrading, a 6,100-foot tiered retaining wall system, Read more...
  • Architecture & Design

    Proven Over Time

    A 20-year look at a project that expanded the role of tilt-up in office design—and continues to perform today. Read more…
  • Architecture & Design

    A Coastal Prototype in Tilt-Up Construction

    A residential duplex in Marcoola, Queensland, is challenging conventional assumptions about where tilt-up construction belongs. Designed for a demanding coastal environment, the project demonstrates how site-cast concrete can deliver durability, comfort, and architectural refinement—pointing to Read more...
  • System Evaluation & Decision-Making

    Evaluating Tilt-Up More Accurately

    Tilt-up construction is often underestimated because it is evaluated as a building type rather than understood as a delivery system. By examining where that misclassification limits judgment, this article reframes tilt-up’s role across office, education, Read more...
Editor’s Pick

Building Less to Deliver More

Recognized with TCA’s Excellence in Sustainability + Resiliency Award, this large-scale industrial project demonstrates how material efficiency can deliver measurable reductions in carbon, water use, and energy demand. Read more…

Design + Engineering

Projects

People + Perspectives

TCA Originals