Construction Management & Sequencing
Sequencing Tilt-Up and Steel in School Construction
The Cyprus High School Replacement in Magna, Utah, used 625 unique tilt-up panels coordinated with architectural features and building services. Crews alternated panel erection with steel framing installation, tying each section into the structure before advancing. The sequence helped maintain structural stability and site access across the 505,500 sq ft facility.
