Goodman Eastvale Commerce Center

The Goodman Eastvale Commerce Center sits on 124.1 acres and is comprised of ten-buildings, totaling 2,598,247 s.f., of multi-use concrete tilt-up product. The two largest facilities within the center span 1 million-square-feet and are used for E-Commerce fulfillment. The largest building, (Building 1) contains 4 levels, and 1.7 million-square-feet of corrugated metal decking filled with 7.5# fiber reinforced concrete and welded wire reinforcement. In addition, the center also includes a 374,000 s.f spec warehouse, a business park with seven multi-use, distribution, and retail store-front buildings totaling 179,000 s.f., a pedestrian tilt-up bridge, and 4.7 acres of surface parking. The pedestrian bridge features two elevator shafts and is supported structurally, by two 110’ long by 57” tall girders connecting the commerce center to the surface parking lot. An astonishing 1,7 million-square-feet of combined concrete paving was completed for truck docks and auto parking throughout the site. The whole project was delivered within an accelerated timeframe, taking 29 months, 163,422 man-hours and over 181,151 cubic yards to construct. 200 acres of on- and off-site work was also required including construction of Goodman Road, and widening and improvements on Hamner, Bellegrave Ave., and Cantu-Galleano. The project is surrounded by different county lines and required coordination with the cities of Eastvale and Ontario, as well as CalTrans, SCE, and The Gas Company. Additional infrastructure work included 3,200 ft. of industrial sewer, 6.1-acre detention basin/bioswales, curb and gutter, street lighting, signalization, 4,000 ft of 60” RCP storm drain, and median and perimeter landscaping.  
Main banner image for Goodman Eastvale Commerce Center

Project Location

Eastvale, CA
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2020

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
Oltmans Construction Co.
Concrete Contractor:
 
Architect:
 
Engineer:
Prestige Tilt-Up Consulting, Inc.
HSA and Associates
Suppliers:
 
Photographer(s):
Andrew Leeson

Project Specifics

Project Category:
Distribution
Building Types:
Distribution Center
Finishes:
Paint (Flat)
Features:
Cantilevered Panels
Interlocking Panels
Reveals
Insulation:
Post Applied (Interior)
Environmental:
LEED Certified
Number of Floors:
3
Number of Panels:
1,150 panels
Tilt-Up Wall Area:
898,241 sq ft (83,447 sq m)
Total Floor Area:
4,293,455 sq ft (398,862 sq m)
Project Footprint:
2,598,247 sq ft (241,377 sq m)
Tallest Panel:
58 ft 0 in (17.68 m)
Widest Panel:
23 ft 1 in (7.04 m)
Largest Panel:
1,566 sq ft (145.5 sq m)
Heaviest Panel:
223,200 lbs (101,242 kg)
Tallest Cantilever:
57 ft 0 in (17.37 m)
Longest Spandrel:
23 ft 1 in (7.04 m)
Recycled Content:
330 tons (US)