Heavy Fleet Corporate Headquarters

With the objective of constructing a “South Beach” art deco warehouse and distribution center in an industrial park for Heavy Fleet, Tilt-Up was the ideal solution that resulted in a unique architectural statement showcasing the owner’s taste. Simple elements were used to provide an exterior façade that is unique, interesting and timeless. Vertical fins and spires were used to break-up the façade and provide an interesting elevation. Horizontal elements include a painted steel sunscreen/canopy and horizontal reveals. Pineapple Grove precast medallions were applied in recessed areas above the main entrance to architecturally enhance the panels and coffered ceilings accent the main reception area and the president’s office. Further, a 10-foot cantilevered galvanized steel-finned sunscreen with a canopy can be found at the main entrance and four 24-foot anodized aluminum spires in stainless steel boots accent the main and retail entrance.

Schedule also was a key factor in the selection of Tilt-Up as Heavy Fleet was seeking to, with the creation of this new 20,059 square foot structure, merge two existing facilities into one and the existing leases were due to expire. Tilt-Up construction allowed the contractor to construct the building while performing the site work. Even though the project was built through the winter with extensive soils challenges, the construction was completed in only 189 days. Tilt-Up construction also provided the owner with a durable, relatively maintenance-free facility, which is key for this heavy truck maintenance and parts distribution center.

Although many industrial projects have similar exterior finishes, the Heavy Fleet Corporate Headquarters is definitely a project that went outside the box. But, even with its bold statement, it blends well with the other buildings in the industrial park and has lasting value and marketability for the owner.

 
Main banner image for Heavy Fleet Corporate Headquarters

Project Location

Manassas, VA 20109
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2008

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
Vantage Construction Corporation
Concrete Contractor:
 
Architect:
Morgan Gick McBeath and Associates PC
Engineer:
Leviat
Suppliers:
Leviat
Nox-Crete Products Group
Photographer(s):

Project Specifics

Project Category:
Distribution
Building Types:
Finishes:
Features:
Insulation:
Environmental:
Number of Floors:
0
Number of Panels:
33 panels
Tilt-Up Wall Area:
18,120 sq ft (1,683 sq m)
Total Floor Area:
20,059 sq ft (1,863 sq m)
Project Footprint:
20,059 sq ft (1,863 sq m)
Tallest Panel:
36 ft 6 in (11.13 m)
Widest Panel:
20 ft 7 in (6.27 m)
Largest Panel:
730 sq ft (67.8 sq m)
Heaviest Panel:
59,530 lbs (27,002 kg)