Fellowship Alliance Chapel

This building was designed with another construction method, but once the owner and architect understood that tilt-up could handle the demands of the project, it was completed using the tilt-up method.

The 69,000-square-foot building was constructed in nine months, with some additional time for interior details. One of the biggest challenges was the 156-foot clear span from the back of the sanctuary to the altar. For the sanctuary’s desired height, the team created 61-foot-tall panels.

 
Main banner image for Fellowship Alliance Chapel

Project Location

Medford, NJ 08055
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2017

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
LJB Inc.
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Worship
Building Types:
Church
Finishes:
Paint (Textured)
Stone
Features:
Angled Panels (Elevation-Edge/Shape)
Formliner
Insulation:
Sandwich Panel (Non-Composite)
Environmental:
Number of Floors:
2
Tilt-Up Wall Area:
43,000 sq ft (3,995 sq m)
Total Floor Area:
68,935 sq ft (6,404 sq m)
Project Footprint:
46,355 sq ft (4,306 sq m)
Tallest Panel:
60 ft 11 in (18.57 m)
Widest Panel:
25 ft 0 in (7.62 m)
Largest Panel:
716 sq ft (66.5 sq m)
Heaviest Panel:
60,000 lbs (27,216 kg)
Longest Spandrel:
14 ft 10 in (4.53 m)