Limited space and site constraints for this structure on an existing campus located in a metropolitan area created a huge logistic challenge and required a great deal of planning. Project scope included all cast-in-place and Tilt-Up concrete, as well as structural steel and hollow-core planks.
With the exception of a 30-foot wide crane access road, the available area on-site was completely covered with temporary casting slabs. This provided enough casting area to construct the building walls in two sequences. There was no access on three sides of the building, so the walls, structural steel, and hollow-core planks had to be erected from inside the building footprint. Once the walls were in place, structural steel erection commenced, followed by the hollow-core planks and topping pours. This allowed the installation of interior framing, wiring and mechanical systems to begin on the first half of the building. During this time, the casting beds were reused for the construction of sequence two panels. The erection process was repeated on the second half of the building, followed by the installation of underground plumbing and electrical pipes and conduits, and ultimately the slab-on-grade. The structure was completed in 15 weeks, and interior work was able to commence in only 11 weeks, minimizing the overall duration of construction.
Utilizing the Tilt-Up system was instrumental in helping the design and construction teams achieve the challenging logistical and schedule issues. The building’s design reflects the clean and functional expression of the structure, utilizing extensive glazing panels at key locations to emphasize the vertical circulation elements of the building and to enable natural light to penetrate the common areas of the building. Tilt-Up panel rustication and a deeper color were used at the first floor of the building to "ground the building" and give it a more human scale; colored panels help to define and give depth to layered tilt panels that emphasize the vertical nature of the building.
North Miami, FL 33181
United States
The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.
ACHIEVEMENT
2012
The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >