Desert Hills High School

Built in only 20 months, this three-building school campus consists of athletic, vocational and classroom structures totaling approximately 250,000 square feet. Although Tilt-Up panels with integrally-colored concrete were selected for schedule reasons, the method also offered economy and aesthetic freedom.

The two colors of concrete for the Tilt-Up panels, chosen to complement the area’s sandstone hills and red soil, were further embellished by using different depths of sand-blasting, creating color variations and textures on individual panels. This project was not only a challenge to design but also to build. The panels varied greatly in geometry and many spandrel and cantilevered panels were used to accommodate entryways and large openings. Sandwich panels were used in some locations for exterior walls areas that required a durable wall surface such as the gymnasium, wrestling room, cabinet shop and welding shop. Because of the project complexity, each panel was elevated to ensure architectural and structural stability.

The end result is an efficient, cost-effective campus that serves more than 1,500 students.

 
Main banner image for Desert Hills High School

Project Location

St. George, UT 84790
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2009

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
BHB Consulting Engineers PC
Suppliers:
HD Supply Construction & Industrial White Cap
Photographer(s):

Project Specifics

Project Category:
Building Types:
Finishes:
Features:
Insulation:
Environmental:
Number of Floors:
0
Number of Panels:
290 panels
Tilt-Up Wall Area:
62,500 sq ft (5,806 sq m)
Total Floor Area:
250,000 sq ft (23,225 sq m)
Project Footprint:
218,000 sq ft (20,252 sq m)
Tallest Panel:
36 ft 6 in (11.14 m)
Widest Panel:
27 ft 0 in (8.23 m)
Largest Panel:
900 sq ft (83.6 sq m)
Heaviest Panel:
87,300 lbs (39,599 kg)
Tallest Cantilever:
12 ft 0 in (3.66 m)
Longest Spandrel:
19 ft 7 in (5.98 m)