Tilt-Up was utilized for these three buildings, totaling 251,400 square feet, because of the architectural freedom provided by the building method, such as the curtain wall above the entries. There is 1/4 inch spandrel glass on an aluminum track, and the tallest panel is about 35 feet, with the heaviest panel weighing about 55,000 lbs.
The completed facilities cost about $22.50 per square foot and construction was completed in 222 days. Meadow Burke accessories and TEX-COTE paint were utilized.
For more information, please contact Glen Stephens of SAA Architecture LLC at(301) 513-0600.
Clarksburg, MD 20871
United States
The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.
ACHIEVEMENT
2001
The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >