The Park @ Live Oak

Summarize the project's program, features and achievements?

The project at The Park at Live Oak in Irwindale involves site development for industrial and commercial space spanning 78.3 acres, with entitlements for 1.55 million s.f.. Notably, Building 3 was constructed with a low embodied carbon mix design, switching to Type 1PLC (Portland Limestone Cement) powder, aligning with state mandates for reducing global warming potential and carbon emissions.

What obstacles were overcome related to the schedule, budget, program, specification, site, etc. on this project?

Various obstacles were overcome during the project, including those related to schedule, budget, and specifications. Coordination with multiple stakeholders such as regulatory agencies presented challenges, but the project stayed on track for completion by the scheduled deadline of summer 2024. Budget challenges were addressed through efficient resource allocation and procurement strategies.

Please communicate any engineering complexities or unique features of the panel design for this project?

The engineering complexities of the panel design involved transitioning to a low embodied carbon mix design for Building 3. This required careful selection and integration of materials, such as Type 1PLC powder, to achieve reduced global warming potential (GWP) compared to traditional cement powders. Mock-ups, trials, and testing were conducted to ensure the efficacy and sustainability of the panel design.

What is the potential for this project's impact on the community and/or environment?

The project's impact on the community and environment is substantial. By utilizing a low embodied carbon mix design for Building 3, the project demonstrates a commitment to reducing carbon emissions and environmental impact. Furthermore, achieving LEED Silver certification for Phase 1 buildings underscores the project's sustainability efforts, contributing positively to the community and environment.

 
Main banner image for The Park @ Live Oak

Project Location

Irwindale, CA 91706
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2024

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
Oltmans Construction Co.
Concrete Contractor:
 
Architect:
RGA Architects, Inc.
Engineer:
 
Suppliers:
 
Photographer(s):
Jon Newell

Project Specifics

Project Category:
Production/Manufacturing
Building Types:
Manufacturing Plant
Finishes:
Paint (Flat)
Features:
Reveals
Shadow Panels
Insulation:
Post Applied (Interior)
Environmental:
LEED Certified - Silver
Number of Floors:
1
Number of Panels:
477 panels
Total Floor Area:
813,562 sq ft (75,580 sq m)
Tallest Panel:
47 ft 8 in (14.53 m)
Widest Panel:
32 ft 8 in (9.96 m)
Largest Panel:
1,507 sq ft (140.0 sq m)
Heaviest Panel:
234,200 lbs (106,231 kg)