Dr. Ma's Laboratories

Summarize the project's program, features, and achievements: This project represents an exceptional achievement in constructing a state-of-the-art facility that caters specifically to the needs of Dr. Ma's Laboratories, a leading Canadian-based certified GMP manufacturer of Natural Health Products (NHP). Dr. Ma's Laboratories has established itself as a prominent player in the industry, with over 26 years of experience in manufacturing traditional remedies and innovative natural health products. With a focus on botanical extracts, dietary supplements, vitamins, and minerals, they have garnered a reputation for their commitment to quality and advanced manufacturing solutions. The build-to-suit project encompasses a remarkable single-user facility spanning 43,886 square feet. The design and construction of this facility reflect a meticulous understanding of Dr. Ma's Laboratories' operational requirements, providing them with an ideal environment to carry out their crucial work. Including a full office space, additional mezzanine area, and dedicated laboratory space demonstrates the thoughtful planning and attention to detail invested in this project. The collaborative approach undertaken during the development of this project deserves commendation. The project team worked closely with Dr. Ma's Laboratories to understand their unique needs and goals, resulting in a facility that perfectly aligns with their vision. The effective coordination and seamless execution of this undertaking are a testament to the expertise and professionalism of all involved.

What obstacles were overcome related to the schedule, budget, program, specification, site, etc. on this project? The Dr. Mas’ Laboratories project overcame several significant obstacles related to the schedule, budget, program, specifications, and site constraints. Despite these challenges, the project team demonstrated remarkable resilience and successfully delivered an exceptional facility within the established parameters. One of the primary obstacles faced was the constraint of a small site. Working within limited space posed logistical challenges for construction activities, material storage, and equipment movement. The team strategized and implemented meticulous planning and coordination to optimize the use of available space and ensure smooth project execution. Another obstacle encountered during the project was the concrete strike. Concrete strikes can disrupt construction schedules and impact project timelines. However, the project team swiftly addressed this issue by promptly engaging concrete suppliers, adjusting construction sequencing, and implementing effective communication channels to mitigate delays and maintain project momentum. Additionally, the project faced a longer-than-typical lead time on materials, which posed challenges in maintaining the project schedule. However, the team proactively addressed this issue by establishing strong relationships with suppliers, closely monitoring material deliveries, and implementing alternative strategies to expedite the procurement process. Through effective communication and proactive management, the team successfully minimized the impact of extended lead times on project milestones. Despite these obstacles, the project team demonstrated exceptional adaptability, resourcefulness, and effective problem-solving skills. They continuously monitored the project's progress, promptly addressed issues as they arose, and implemented innovative solutions to overcome challenges without compromising the project's overall quality or exceeding the allocated budget.

What is the potential for this project's impact on the community and/or environment? The potential impact of this project extends beyond its immediate scope and has the potential to positively influence both the community and the environment. The great location of the facility within a new industrial hub amplifies its significance and potential contributions. Dr. Ma's Laboratories reinforces the local economy and community. The presence of a leading manufacturer of Natural Health Products creates job opportunities, attracts skilled professionals, and stimulates economic growth. The project's location within a new industrial hub offers collaboration, knowledge exchange, and industry advancement opportunities. The proximity to other businesses and organizations in related fields encourages synergy, innovation, and sharing of best practices. This collaborative environment can lead to advancements in research and development, technology adoption, and sustainable manufacturing practices, benefiting the community, the broader industry, and the environment. The facility's location within a new industrial hub amplifies its potential contributions through job creation, economic growth, promoting natural health products, and fostering a collaborative and innovative environment. It sets the stage for long-term positive effects on the community, the industry, and the environment, reinforcing its importance and deserving recognition.

 
Main banner image for Dr. Ma's Laboratories

Project Location

Surrey, B.C. V3S 0L5
Canada

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
Weiler Smith Bowers Structural Engineers
Suppliers:
 
Photographer(s):
Andrew Fyfe

Project Specifics

Project Category:
Distribution
Building Types:
Laboratory
Finishes:
Paint (Flat)
Features:
Reveals
Insulation:
Sandwich Panel (Composite)
Environmental:
Number of Floors:
2
Tilt-Up Wall Area:
30,756 sq ft (2,857 sq m)
Total Floor Area:
43,886 sq ft (4,077 sq m)
Project Footprint:
28,684 sq ft (2,665 sq m)
Tallest Panel:
39 ft 1 in (11.91 m)
Widest Panel:
23 ft 11 in (7.29 m)
Largest Panel:
855 sq ft (79.4 sq m)
Heaviest Panel:
106,029 lbs (48,094 kg)