Summarize the project's program, features, and achievements: 2688 L.F. Perimeter Footings 143 EA Interior Spread Footings 450,000 S.F. 7"Thick SOG with 12X12 W/D12XW/D12 reinforcing 126,000 S.F 9-1/4" Thick Panels 60,000 S.F. 8" Thick Concrete Apron with #5 @ 12" O.C.
What obstacles were overcome related to the schedule, budget, program, specification, site, etc. on this project? 60 plus inches of rainfall.Unsuitable soil conditions.Cement shortages.Fly Ash shortages.Crane procurement issues.
Augusta, GA 30906
United States