Home About Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory login

Synergy Canyons Phase III

Summarize the project's program, features and achievements.

The completion of Synergy Business Park Phase III is the last chapter for this site development plan. The last two architectural tilt-up buildings were completed to match the previous four. Two colors of exposed concrete (onyx & gray), sandblasting, and reveals were used to create the patterns visible on the exterior of the building. Major demolition, unique excavation needs, and widespread supply chain issues were early challenges that threatened the success of this project. Working closely with the owners, design team, Sandy city, and special inspectors helped ensure a high quality building. However, our greatest asset came in the form of a very detail oriented tilt-up contractor. Although Stout did not construct the first phase of the project, we were asked to match the color and finish of the first two buildings on site. Thanks to our talented tilt-up contractor, who has a TCA Certified Supervisor leading the team, we were able to match and even exceed expectations during phases II and III.

 
Main banner image for Synergy Canyons Phase III

Project Location

Sandy, UT 84070
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Distribution
Building Types:
Distribution Center
Finishes:
Concrete (Raw/Sealed)
Features:
Formliner
Insulation:
Post Applied (Interior)
Environmental:
Number of Floors:
1
Number of Panels:
76 panels
Total Floor Area:
121,241 sq ft (11,263 sq m)
Project Footprint:
121,241 sq ft (11,263 sq m)
Tallest Panel:
42 ft 4 in (12.90 m)
Widest Panel:
37 ft 1 in (11.30 m)
Heaviest Panel:
105,000 lbs (47,627 kg)