Home Membership Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory Login

HealthPark at Kildaire MOB 1

Project summary provided by submitting company.

HealthPark Medical Office Building provides the community of Cary and Wake Medical Hospital with diagnostic and specialty healthcare services. The site restraints required extensive stacking of panels while the architectural and stain coating demanded very flat casting services. The quality control of embeds, reveals, ledgers and other embedments paid off creating a very high finish for the stain coating. Working with the Architects, LS3P, we were able successful in the desired high level of detail envisioned with the use of recesses, reveals, and formliners. The success of this four-story Medical Office Building is evidenced by the Developers start of an additional five-story Tilt-Up on this site.

 
Main banner image for HealthPark at Kildaire MOB 1

Project Location

Cary, NC
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
 
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Healthcare
Building Types:
Clinic
Office
Finishes:
Stain
Stone
Features:
Formliner
Reveals
Insulation:
Post Applied (Interior)
Environmental:
Number of Floors:
4
Number of Panels:
40 panels
Tilt-Up Wall Area:
27,726 sq ft (2,576 sq m)
Total Floor Area:
91,227 sq ft (8,475 sq m)
Project Footprint:
22,793 sq ft (2,117 sq m)
Tallest Panel:
65 ft 11 in (20.09 m)
Heaviest Panel:
145,373 lbs (65,940 kg)
Longest Spandrel:
21 ft 5 in (6.53 m)
Recycled Content:
0 tons (US)