E-Commerce Center of Hampton

Project summary provided by submitting company.

The E-Commerce project offered many challenges, 2" - 4" recess in an insulated 3-story Tilt-Up project with high traffic lanes on two sides. Working with the Developer and Designers, W.M. Jordan and PMA Architecture, our Design Build Tilt-Up team was successful in creating the desired image. This successful project required immense planning and coordination of the panel details. Our goal to limit the amount of form joints and the recesses helped meet the flat paint requirements. Transition details between the recesses were coordinated to match reveals on the rest of the building. Recessed thin brick and the bolted on concrete band provided the depth of and featured look envisioned by the Architect to produce an architectural attractive building. Coordination allowed for Citadel to overcome the site logistic challenges and turn the building over to the General Contractor ahead of schedule. This project was a huge success for W.M. Jordan and Citadel Contractors.

 
Main banner image for E-Commerce Center of Hampton

Project Location

Hampton, VA
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
 
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Distribution
Building Types:
Finishes:
Brick (Thin)
Paint (Flat)
Features:
Reveals
Stacked Panels
Voids
Insulation:
Sandwich Panel (Non-Composite)
Environmental:
Number of Floors:
3
Number of Panels:
91 panels
Tilt-Up Wall Area:
43,261 sq ft (4,019 sq m)
Total Floor Area:
89,365 sq ft (8,302 sq m)
Project Footprint:
30,499 sq ft (2,833 sq m)
Tallest Panel:
41 ft 0 in (12.50 m)
Heaviest Panel:
134,832 lbs (61,159 kg)
Longest Spandrel:
27 ft 7 in (8.41 m)
Recycled Content:
0 tons (US)