ProLogis Park 70 Building #2

Providing a state-of-the-art distribution facility in a timely and economical manner were the main goals for this project. The prime location for the facility offers optimum highway accessibility, which required visual appeal.

Tilt-Up was selected for its cost of construction, ability to provide an interior clear height of 32 feet and the reduced maintenance over the life of the building. The project was completed on a 185-day construction schedule including all weather delays, which was exceptional given the size of the building and site work required.

To de-emphasize the typical box look associated with Tilt-Up construction, an innovative erection procedure was used for the panels that offers cornices and wing walls. The sandwich panel wing walls at the office entries required panels to be at an angle until the secondary panel was set, and then the panels could be brought together.

The framing and erection of the cornice panels also required special effort because the cornice panel cross-section was a trapezoid and required special forming. Because of the weight of the cornice panels, the roof diaphragm had to be in place prior to setting the panels; however, part of the roof diaphragm was supported by the cornice panels. This necessitated that the entire erection of the roof diaphragm, and the cornice panels were closely coordinated so that the bottom panels were not overloaded.

Additional architectural features included extra reveals and the ProLogis signature logo on the facility.

The project was awarded Colorado Construction magazine’s Silver Hard Hat Award in September 2005.

 
Main banner image for ProLogis Park 70 Building #2

Project Location

Aurora, CO 80010
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2006

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
Leviat
Suppliers:
Leviat
Photographer(s):

Project Specifics

Project Category:
Distribution
Building Types:
Finishes:
Features:
Insulation:
Environmental:
Number of Floors:
0
Total Floor Area:
283,666 sq ft (26,353 sq m)
Tallest Panel:
42 ft 6 in (12.95 m)
Largest Panel:
1,094 sq ft (101.6 sq m)
Heaviest Panel:
102,360 lbs (46,430 kg)