UCSD East Campus Office Building

The UCSD East Campus Medical Office Building is situated right at the seam of a rustic canyon habitat and the formal Health Sciences Scholar's Walk, and the design of the building provides the link between the two.

The building's shell combines concrete and curtain wall systems to represent and relate to the two types of landscape that surround the building. Textured, patterned site-cast Tilt-Up concrete walls face the canyon side of the site and appear as an extension or outcropping of the canyon geology. With a program requirement for a large number of uniformly sized perimeter offices, it was important to use a variety of textures and patterns in the concrete to add visual interest and rhythm to what would otherwise have been a repetitive window module. Several techniques were employed to maximize the architectural expressiveness of the concrete: three different form liner types, three levels of sand blast, exposed aggregate panels, and varying panel depths work together to create a rich appearance.

In contrast to the rugged concrete surface facing the canyon, a highly refined curtain wall system faces the discretely landscaped interior of the site. A unitized curtain wall system creates a sheer surface in contrast to the concrete, and is patterned with custom-fit patterns that emulate the concrete form liner as a way to visually link the two systems. Early and continuous collaboration with both the concrete contractor and the curtain wall contractor allowed the team to maximize the design potential and value to the owner for both systems.

 
Main banner image for UCSD East Campus Office Building

Project Location

La Jolla, CA 92037
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2012

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
Miyamoto International, Inc.
Suppliers:
 
Photographer(s):
Ryan Gobuty

Project Specifics

Project Category:
Higher Education
Building Types:
Classroom Building
Clinic
College & University
Office
Finishes:
Applied Ornament
Concrete (Raw/Sealed)
Features:
Cantilevered Panels
Formliner
Interlocking Panels
Reveals
Shadow Panels
Insulation:
Environmental:
Number of Floors:
3
Number of Panels:
24 panels
Tilt-Up Wall Area:
23,097 sq ft (2,146 sq m)
Total Floor Area:
75,000 sq ft (6,968 sq m)
Project Footprint:
25,000 sq ft (2,323 sq m)
Tallest Panel:
49 ft 0 in (14.94 m)
Widest Panel:
29 ft 6 in (8.99 m)
Largest Panel:
1,494 sq ft (138.8 sq m)
Heaviest Panel:
186,810 lbs (84,736 kg)
Longest Spandrel:
89 ft 3 in (27.20 m)