Go inside the construction of the Diablo project in Las Vegas, NV. It included 38 foot tall insulated walls that were constructed using a new technology called the Total Integrated Panel System (TIPS). This allowed the team to reduce concrete by 31%, panel weight by 33%, and rebar by 80% compared to a standard 7.25"" panel. The tour includes a walk through of the construction process utilizing this new system.