Home About Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory login

[TOUR] Diablo Office Warehouse

Available On Demand starting Monday, October 5

Go inside the construction of the Diablo project in Las Vegas, NV. It included 38 foot tall insulated walls that were constructed using a new technology called the Total Integrated Panel System (TIPS). This allowed the team to reduce concrete by 31%, panel weight by 33%, and rebar by 80% compared to a standard 7.25"" panel. The tour includes a walk through of the construction process utilizing this new system.

LEARNING OBJECTIVES

  • Get an introduction to a product new to the market, the Total Integrated Panel System (TIPS).
  • Hear more of the benefits of using insulated tilt-up panels.
  • See an example of how this project utilized technology to improve their building outcome.
  • Visit a tilt-up job site.

This session includes on-demand content available for registered attendees who are currently logged on.

Browse by Event Track / FULL SCHEDULE