The newly established nursing college boasts state of the art facilities, including modern simulation labs, fully equipped classrooms, and collaborative spaces. Designed to foster hands-on learning and innovation, the college offers a comprehensive curriculum aligned with current healthcare standards.
A particularly challenging aspect of this project involved ensuring that the thin brick pattern aligned precisely across each panel once erected. Achieving this required careful planning and coordination during both the design and installation phases. Additionally, the project faced significant weather-related setbacks, including two hurricanes, which resulted in scheduling delays and necessitated adjustments to the construction timeline. Despite these obstacles, the team successfully maintained the integrity and quality of the final structure.
The thin brick installation process for concrete tilt-up panels is inherently complex and requires a high level of precision. Each brick must be meticulously placed into form liners before the concrete is poured, ensuring consistent alignment, spacing, and depth across all panels. Any deviation during placement can lead to misalignment once the panels are erected, which is especially problematic when brick patterns must seamlessly continue across multiple panels. Furthermore, maintaining uniformity in color and mortar joints adds another layer of difficulty, as environmental factors such as moisture and temperature can affect the curing process. This method demands close coordination between design, fabrication, and installation teams to achieve a clean, professional appearance that meets architectural intent.
Pooler, GA 31322
United States