Home About Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory login

Galen College of Nursing

Summarize the project's program, features and achievements?

The newly established nursing college boasts state of the art facilities, including modern simulation labs, fully equipped classrooms, and collaborative spaces. Designed to foster hands-on learning and innovation, the college offers a comprehensive curriculum aligned with current healthcare standards.

What obstacles were overcome related to the schedule, budget, program, specification, site, etc. on this project?

A particularly challenging aspect of this project involved ensuring that the thin brick pattern aligned precisely across each panel once erected. Achieving this required careful planning and coordination during both the design and installation phases. Additionally, the project faced significant weather-related setbacks, including two hurricanes, which resulted in scheduling delays and necessitated adjustments to the construction timeline. Despite these obstacles, the team successfully maintained the integrity and quality of the final structure.

Please communicate any engineering complexities or unique features of the panel design for this project?

The thin brick installation process for concrete tilt-up panels is inherently complex and requires a high level of precision. Each brick must be meticulously placed into form liners before the concrete is poured, ensuring consistent alignment, spacing, and depth across all panels. Any deviation during placement can lead to misalignment once the panels are erected, which is especially problematic when brick patterns must seamlessly continue across multiple panels. Furthermore, maintaining uniformity in color and mortar joints adds another layer of difficulty, as environmental factors such as moisture and temperature can affect the curing process. This method demands close coordination between design, fabrication, and installation teams to achieve a clean, professional appearance that meets architectural intent.

 

Project Location

Pooler, GA 31322
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

Developer/Owner:
 
General Contractor:
 
Concrete Contractor:
Kent Companies, Inc.
Architect:
 
Engineer:
 
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Higher Education
Building Types:
College & University
Finishes:
Brick (Thin)
Features:
Formliner
Insulation:
Environmental:
Number of Floors:
3
Number of Panels:
36 panels
Total Floor Area:
21,661 sq ft (2,012 sq m)
Project Footprint:
21,661 sq ft (2,012 sq m)