Home About Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory login

Oculus Project Glaze

Summarize the project's program, features and achievements?

Tilt Panels were set on a piling and grade beam system, Due to this system, the Crawler crane was required to remain outside of the building footprint as to not damage the piles or the grade beams when setting the panels. Interior tilt wall core housed the operations, maintenance, and offices for the manufacturing plant. There was also a rail crane that was attached to the tilt panels on a haunch that ran the length of the building.

 

Project Location

Port St Lucie, FL 34987
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

Developer/Owner:
 
General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
 
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Production/Manufacturing
Building Types:
Manufacturing Plant
Finishes:
Concrete (Raw/Sealed)
Features:
Insulation:
Sandwich Panel (Composite)
Environmental:
Number of Floors:
4