Home About Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory login

FitSportLife

Summarize the project's program, features and achievements?

The project is a state-of-the-art sports and recreation facility designed to meet diverse athletic and community needs. Central to the facility are three full-size basketball courts, each equipped with modern flooring, professional-grade hoops, and ample seating for spectators. These courts are not only suitable for basketball games and tournaments but can also be utilized for other indoor sports such as volleyball and badminton, providing a versatile space for various athletic events. The inclusion of a dedicated room for athletic cheer and gymnastics further enhances the facility's offerings. This specialized room is equipped with high-quality mats, balance beams, and other necessary equipment to support rigorous training and practice sessions for cheerleaders and gymnasts of all levels.

In addition to these athletic facilities, the project includes space designed to accommodate 3-4 tenants. The presence of these tenants will not only generate additional revenue but also create a comprehensive sports hub that caters to the needs of the community. Tenants will benefit from the steady flow of visitors to the facility, while patrons will enjoy the convenience of having various sports and health services available under one roof. One of the standout features of this project is its readiness for future expansion. The facility has been designed with growth in mind, ensuring that it can adapt to changing needs and increased demand over time. Whether it's adding more sports courts, expanding the gymnastics room, or creating additional space for new tenants, the project's infrastructure can accommodate these enhancements with minimal disruption.

The project has already achieved significant milestones, including securing necessary permits, completing construction on time, and receiving positive feedback from initial users. Community engagement has been a priority, with several local sports teams and organizations expressing interest in utilizing the space for their activities. These achievements underscore the project's potential to become a central hub for sports and recreation in the area. In summary, this project is more than just a sports facility; it is a community asset that combines state-of-the-art amenities with strategic planning for future growth. With its versatile courts, dedicated gymnastics room, tenant spaces, and readiness for expansion, it is poised to serve the athletic and recreational needs of the community for years to come. The project stands as a testament to thoughtful design, community focus, and sustainable development, promising to enrich the lives of those who use it and support a vibrant, active community.

What obstacles were overcome related to the schedule, budget, program, specification, site, etc. on this project?

One primary challenge was dealing with adverse weather, specifically 65 days of rain, which disrupted the construction timeline. To address this, the project team rescheduled work, increased labor when weather permitted, and utilized advanced construction techniques to make up for lost time. Staying within the budget was also a major challenge due to the additional costs from weather delays, such as temporary weather protection, extended labor hours, and equipment rentals. The team conducted regular budget reviews, negotiated with suppliers for better rates, and optimized resource allocation to reduce expenses without compromising quality or safety.

Ensuring that the basketball courts, athletic cheer and gymnastics room, and tenant spaces met all required standards involved meticulous planning and coordination with architects, engineers, and consultants. Regular site inspections and quality control checks ensured compliance with project standards. Site-specific challenges included dealing with terrain and soil conditions, which required careful assessment and preparation to ensure proper drainage and foundation stability, especially given the high volume of rainfall. The project team addressed these issues through detailed planning and appropriate construction techniques and materials.

Despite these obstacles, the project was completed on time and within budget due to the resilience and dedication of the project team, who effectively adapted to changing circumstances and implemented successful problem-solving strategies.

Please communicate any engineering complexities or unique features of the panel design for this project?

The engineering aspects of the panel design for this project are both complex and distinctive. One notable feature is the use of hand-laid brick on panels throughout the entire building. This method requires meticulous craftsmanship to ensure precise alignment and secure attachment, resulting in a visually striking façade that adds architectural charm to the structure. Another unique aspect is the front courtyard, where large openings are incorporated into the tiltwall panels. These openings not only enhance the aesthetic appeal of the courtyard but also serve a functional purpose by allowing natural light and ventilation to penetrate the space, creating a welcoming and airy environment for visitors. Above the basketball courts, the design includes large steel single-span panels, which are engineered to provide structural support without the need for additional columns or supports. This innovative approach maximizes the usable space within the facility, allowing for unobstructed views and uninterrupted activities on the courts below.

Overall, the panel design for this project showcases a combination of architectural elegance and engineering ingenuity. From the hand-laid brick panels to the strategically placed openings and steel span panels, each element contributes to the functionality, aesthetics, and overall success of the building.

What is the potential for this project's impact on the community and/or environment?

This project has the potential to significantly impact both the community and the environment positively. Built to meet the need for a community recreational sports facility, it is the first of its kind within a 30-mile radius. This facility provides essential amenities such as three full-size basketball courts and a dedicated room for athletic cheer and gymnastics, making it a central hub for sports and fitness activities. For the community, the facility promotes physical health and well-being by encouraging residents of all ages to engage in regular exercise and recreational sports. It supports local sports teams and organizations, offering a venue for training, competitions, and events, thereby fostering community spirit and teamwork.

Overall, this facility is a vital community asset that enhances public health, strengthens community bonds, and promotes environmental sustainability. Its unique offerings and strategic location ensure it will serve as a cornerstone for local recreation and community engagement for years to come.

 
Main banner image for FitSportLife

Project Location

Rockwall, TX 75032
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2024

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)