Aligned Energy SLC 03

Summarize the project's program, features and achievements?

Aligned Data Center SLC 03 is the final phase of a data center campus in suburban Salt Lake City. Suntec Concrete executed the tilt-up pase of the project with Layton Construction serving as general contractor. The tilt-up process for the 86 panels that Suntec placed took 60 days to execute. The panels were a standard 8-inch thickness, but they were not for structural in function, but a façade for the building. They were lifted and connected to the existing structural framework of the building. The panels featured elaborate reveal designs to accentuate the aesthetics of the facility.

SLC 03 is the final phase of a three-building data center campus for Aligned Energy, which has four data centers in the Salt Lake City market. In total, the campus features more than 100 MW of capacity on 55 acres. SLC 03 is an 80 MW build-to-scale facility, the largest of the three in terms of capacity. At 3 stories, SLC 03 has 480,000 square feet of data storage space.

What is the potential for this project's impact on the community and/or environment?

Salt Lake City is an emerging data center market and is ideally located to serve the Pacific Northwest as data storage demands continue to grow nationwide. SLC 03 is the final phase of a three-building data center campus for Aligned Energy, which has four data centers in the Salt Lake City market. In total, the campus features more than 100 MW of capacity on 55 acres. SLC 03 is an 80 MW build-to-scale facility, the largest of the three in terms of capacity.

 
Main banner image for Aligned Energy SLC 03

Project Location

West Jordan, UT 84088
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2024

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
Suntec Concrete
Architect:
 
Engineer:
 
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Technology
Building Types:
Data Center
Finishes:
Paint (Flat)
Paint (Textured)
Features:
Reveals
Insulation:
Uninsulated
Environmental:
Number of Floors:
3
Number of Panels:
86 panels
Total Floor Area:
223,357 sq ft (20,750 sq m)
Project Footprint:
252,688 sq ft (23,475 sq m)
Tallest Panel:
63 ft 6 in (19.35 m)
Largest Panel:
1,619 sq ft (150.4 sq m)
Heaviest Panel:
186,900 lbs (84,776 kg)