Home About Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory login

Costex Tractor Parts Building

Project consists of a three story office building attached to a two story warehouse. A series of segmented panels form the curbed main office building elevation. Segmented radius elevation is formed by panels supported by integral pilasters and spandrel panels supported by panels with integral pilasters. The pilasters are recessed in to allow for ribbon windows. Only every other panel is supported by integral pilasters, this gives the building front elevation its floating appearance. The owners logo as well as the excavator loader and bulldozer form liners are displayed around the building. Office buildings main lobby show cases a spiral staircase. This project is one of the only two story warehouses in the region.  
Main banner image for Costex Tractor Parts Building

Project Location

Miami, FL 33166
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
Builders Plus, Inc.
Architect:
 
Engineer:
Permit Engineering Services Inc
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Distribution
Building Types:
Distribution Center
Finishes:
Paint (Flat)
Paint (Textured)
Features:
Embedded Items
Formliner
Interlocking Panels
Reveals
Insulation:
Uninsulated
Environmental:
Number of Floors:
3
Tilt-Up Wall Area:
180,727 sq ft (16,790 sq m)
Total Floor Area:
456,684 sq ft (42,426 sq m)
Project Footprint:
212,058 sq ft (19,700 sq m)
Tallest Panel:
64 ft 5 in (19.63 m)
Widest Panel:
38 ft 2 in (11.63 m)
Largest Panel:
1,379 sq ft (128.1 sq m)
Heaviest Panel:
190,300 lbs (86,319 kg)
Longest Spandrel:
38 ft 7 in (11.76 m)