Home About Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory login

Patel High School

The Patel High School is a one of a kind project that was built on an accelerated schedule of 6 weeks from mobilization to erected. The highlights of this project include the use of insulated panels, angle panels, shadow panels, and a feature panel that includes 90 openings later filled with glass block.  
Main banner image for Patel High School

Project Location

Tampa, FL
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

EXCELLENCE

2020

The excellence designation is given to the highest scoring projects each year representing the top 10-12 projects. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
Carr and Sons Masonry
Architect:
 
Engineer:
 
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Schools
Building Types:
High School
Finishes:
Paint (Flat)
Features:
Angled Panels (Elevation-Edge/Shape)
Cantilevered Panels
Embedded Items
Reveals
Shadow Panels
Insulation:
Sandwich Panel (Non-Composite)
Environmental:
LEED Certified
Number of Floors:
2
Number of Panels:
130 panels
Tilt-Up Wall Area:
74,327 sq ft (6,905 sq m)
Total Floor Area:
71,717 sq ft (6,663 sq m)
Project Footprint:
47,562 sq ft (4,419 sq m)
Tallest Panel:
51 ft 5 in (15.67 m)
Widest Panel:
40 ft 8 in (12.40 m)
Largest Panel:
1,979 sq ft (183.8 sq m)
Heaviest Panel:
189,380 lbs (85,901 kg)
Tallest Cantilever:
43 ft 5 in (13.23 m)
Longest Spandrel:
40 ft 8 in (12.40 m)
Recycled Content:
7,463 tons (US)