Great Wolf Lodge

Project summary provided by submitting company.

The Great Wolf Lodge will feature a 85,000 sq ft indoor water park along with a 27,000 sq ft family entertainment center known as the Great Wolf Adventure Park. The six story hotel will accommodate 350 rooms for guest. This project is located southeast of the loop 101 on Talking Stick Way, in Scottsdale, AZ, and is based on sacred Native American Grounds. A special blessing was performed during the groundbreaking of this phenomenal project. The most challenging part of this project was the 948 inch tall tilt panel Suntec lifted which would act as the backbone for the waterslide. This enormous panel superseded the largest panel lifted at that time of 339,000 lbs. Suntec utilized a 300 ton plane crawler crane to lift the 369,600 lbs panel. The width of the panel was 755 inches. At the start of the project there was much discussion of how this could be accomplished. With the help of Gensler, we were able to come up with the tilt-up construction design that was safer for all trades, and accelerated the overall schedule. This new community attraction will assist in driving economic growth and positively impacting Arizona's workforce. Great Wolf Lodge is scheduled to open in October of 2019.

 
Main banner image for Great Wolf Lodge

Project Location

Scottsdale, AZ
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2019

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
Suntec Concrete
Architect:
 
Engineer:
 
Suppliers:
 
Photographer(s):
Patti Reznik Photography

Project Specifics

Project Category:
Hospitality / Lodging
Building Types:
Finishes:
Exterior insulation and finish system (EIFS)
Features:
Angled Panels (Elevation-Edge/Shape)
Cantilevered Panels
Embedded Items
Interlocking Panels
Insulation:
Post Applied (Exterior)
Environmental:
Number of Floors:
6
Number of Panels:
54 panels
Tilt-Up Wall Area:
25,108 sq ft (2,333 sq m)
Total Floor Area:
396,016 sq ft (36,790 sq m)
Project Footprint:
112,000 sq ft (10,405 sq m)
Tallest Panel:
78 ft 7 in (23.95 m)
Heaviest Panel:
369,600 lbs (167,648 kg)
Tallest Cantilever:
78 ft 2 in (23.83 m)