Home About Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory login

1900 Taylor

Project summary provided by submitting company.

This single dock mixed tenant building is a showcase piece of the Colorado Technical Center in Louisville, Colorado. It features custom colors for the main tenant and large areas of storefront on the north side. The corners are an intricate system of narrow columns and deep spandrels to create large glass openings.

 
Main banner image for 1900 Taylor

Project Location

Louisville, CO
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
KB Concrete Systems, Inc.
Architect:
Ware Malcomb
Engineer:
 
Suppliers:
 
Photographer(s):
Nicole Laiho
Rocky Mountain Photography

Project Specifics

Project Category:
Distribution
Building Types:
Distribution Center
Finishes:
Paint (Textured)
Features:
Reveals
Shadow Panels
Insulation:
Environmental:
Number of Floors:
1
Number of Panels:
129 panels
Tilt-Up Wall Area:
74,186 sq ft (6,892 sq m)
Total Floor Area:
136,929 sq ft (12,721 sq m)
Project Footprint:
136,929 sq ft (12,721 sq m)
Tallest Panel:
41 ft 0 in (12.50 m)
Heaviest Panel:
106,200 lbs (48,172 kg)
Longest Spandrel:
27 ft 10 in (8.48 m)