Home About Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory login

Fluid

Project summary provided by submitting company.

This unique office product combines two-story office space with distribution type warehouse storage in the bay beyond. The building sits atop a hill in a Class A office park and gives tenants a unique space to showcase their services and store their products.

 
Main banner image for Fluid

Project Location

Westminster, CO
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2019

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
All-Phase Concrete Construction Inc
Architect:
 
Engineer:
Peak Engineering, Inc.
Suppliers:
 
Photographer(s):
Nicole Laiho

Project Specifics

Project Category:
Office
Building Types:
Finishes:
Paint (Textured)
Stone
Features:
Cantilevered Panels
Reveals
Shadow Panels
Insulation:
Post Applied (Interior)
Environmental:
Number of Floors:
2
Number of Panels:
33 panels
Tilt-Up Wall Area:
11,000 sq ft (1,022 sq m)
Total Floor Area:
30,924 sq ft (2,873 sq m)
Project Footprint:
21,371 sq ft (1,985 sq m)
Tallest Panel:
23 ft 8 in (7.21 m)
Heaviest Panel:
60,000 lbs (27,216 kg)
Longest Spandrel:
37 ft 8 in (11.48 m)