FCC Environmental

Project summary provided by submitting company.

FCC Environmental is a Materials Recovery Facility in northeast Houston servicing the city’s residential recycling needs. The 104,000 SF facility is divided into two main components: office and processing floor. A pre-engineered metal building houses the fully automated sorting and processing area while load bearing tilt wall construction was used for the adjoining 14,000 SF office. This office serves as the front door of the facility and contains administrative offices, employee support areas and public education center, consisting of a large meeting room and elevated pathway for viewing the processing area. This facility was designed to FCC and City of Houston standards and can process 145,000 metric tons of waste per year.

 
Main banner image for FCC Environmental

Project Location

Houston, TX
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
 
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Production/Manufacturing
Building Types:
Finishes:
Paint (Textured)
Features:
Angled Panels (Plan-Orientation/Position)
Reveals
Insulation:
Post Applied (Interior)
Environmental:
Number of Floors:
1
Number of Panels:
25 panels
Tilt-Up Wall Area:
12,442 sq ft (1,156 sq m)
Total Floor Area:
117,669 sq ft (10,931 sq m)
Project Footprint:
117,022 sq ft (10,871 sq m)
Tallest Panel:
28 ft 0 in (8.53 m)
Heaviest Panel:
98,600 lbs (44,724 kg)
Longest Spandrel:
29 ft 11 in (9.12 m)