The Hillsborough Public Operations Complex is designed to consolidate various public safety functions including emergency fire rescue, dispatch, and various government operations. The design team selected tilt-up for both its durability and aesthetic flexibility. At the heart of the project is a one-story 67,000 SF Emergency Operations Building with a warehouse, designed to withstand 200 mph winds from a category five hurricane. Load-bearing insulated sandwich panels create an energy-efficient envelope to the warehouse.
Tampa, FL 33619
United States
The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.
ACHIEVEMENT
2017
The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >