The 60,000-square-foot Reload Gun Range features tilt-up construction for all exterior and interior walls, cast and placed on an extremely tight site. Ranges exposed to the building's exterior were set as double walls with 1-foot separation later filled with insulation to act as sound barriers, along with a poured concrete roof. Panels exposed to the gun ranges were designed as wide as 46 feet to reduce interior joints for bullet ricochet.

 
Main banner image for Reload

Project Location

Tarpon Springs, FL 34689
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2016

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

Search Project Database

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
Carr and Sons Masonry
Architect:
 
Engineer:
 
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Building Types:
Finishes:
Features:
Insulation:
Environmental:
Number of Floors:
0
Number of Panels:
113 panels
Tilt-Up Wall Area:
82,173 sq ft (7,634 sq m)
Total Floor Area:
57,858 sq ft (5,375 sq m)
Project Footprint:
57,858 sq ft (5,375 sq m)
Tallest Panel:
33 ft 11 in (10.34 m)
Widest Panel:
46 ft 0 in (14.02 m)
Largest Panel:
1,174 sq ft (109.1 sq m)
Heaviest Panel:
126,230 lbs (57,257 kg)
Tallest Cantilever:
29 ft 1 in (8.86 m)
Longest Spandrel:
46 ft 0 in (14.02 m)