Home About Awards Events News Resources Certification Projects Construction Tilt-Up Products Directory login

Core Logic

Core Logic's commercial office facility exemplifies creative problem solving and a unique application of tilt-up construction. Due to the soil movement in the area, the facility has no slab on grade. As such, all of the panels were poured on casting beds and braced using deadmen. Panels were cast with an architectural formliner and were erected with little to no stiffbacks.

 
Main banner image for Core Logic

Project Location

Irving, TX 75063
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2016

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

Search Project Database

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
 
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Office
Building Types:
Finishes:
Features:
Insulation:
Environmental:
Number of Floors:
0
Number of Panels:
106 panels
Tilt-Up Wall Area:
75,602 sq ft (7,023 sq m)
Total Floor Area:
325,600 sq ft (30,248 sq m)
Project Footprint:
81,400 sq ft (7,562 sq m)
Tallest Panel:
71 ft 5 in (21.77 m)
Widest Panel:
70 ft 2 in (21.39 m)
Largest Panel:
1,126 sq ft (104.6 sq m)
Heaviest Panel:
233,600 lbs (105,959 kg)
Recycled Content:
163 tons (US)