Cardinal Health MPS Distribution Center

 

Project Location

Buford, GA 30519
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
 
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Distribution
Building Types:
Finishes:
Features:
Insulation:
Environmental:
Number of Floors:
0
Number of Panels:
172 panels
Tilt-Up Wall Area:
130,000 sq ft (12,077 sq m)
Total Floor Area:
372,359 sq ft (34,592 sq m)
Project Footprint:
350,000 sq ft (32,515 sq m)
Tallest Panel:
50 ft 10 in (15.49 m)
Widest Panel:
27 ft 11 in (8.52 m)
Largest Panel:
1,268 sq ft (117.8 sq m)
Heaviest Panel:
114,000 lbs (51,710 kg)