For short project time-lines, consider Design/Build - the fast delivery system for project where building construction proceeds while the design is developed, speeding completion. Tilt-up lends itself to this process because wall panel construction can proceed while the rest of the building is designed.
When you decide to build, you want to proceed quickly. With tilt-up, you get compression of disciplines - many phases are completed simultaneously. Therefore, you can move into your building sooner.
Load-bearing reinforced concrete wall panels are cast horizontally on the floor slab or a casting slab, and are tilted up into their final vertical position with high-capacity mobile cranes. The entire process is designed for efficiency and speed of erection.
Because the floor slab is poured first, the other trades can work sooner and in a better work environment, which saves time and money.
Site-cast tilt-up uses ready mixed concrete usually available near the job site. Contractors use local labor.