{"id":8993,"date":"2018-01-11T14:00:33","date_gmt":"2018-01-11T19:00:33","guid":{"rendered":"http:\/\/72.167.124.155\/tilt-uptoday\/?p=8993"},"modified":"2025-10-28T16:04:59","modified_gmt":"2025-10-28T21:04:59","slug":"first-insulated-tilt-up-freezer-in-british-columbia-nearing-completion","status":"publish","type":"post","link":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/2018\/01\/11\/first-insulated-tilt-up-freezer-in-british-columbia-nearing-completion\/","title":{"rendered":"El primer congelador con sistema \u00abtilt-up\u00bb y aislamiento de Columbia Brit\u00e1nica est\u00e1 a punto de completarse"},"content":{"rendered":"<\/div>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-9000\" src=\"http:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2018\/01\/subzero-20161108_140621_edited-RR-300x169.jpg\" alt=\"\" width=\"680\" height=\"383\" srcset=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2018\/01\/subzero-20161108_140621_edited-RR-300x169.jpg 300w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2018\/01\/subzero-20161108_140621_edited-RR-640x360.jpg 640w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2018\/01\/subzero-20161108_140621_edited-RR-768x432.jpg 768w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2018\/01\/subzero-20161108_140621_edited-RR-1024x576.jpg 1024w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2018\/01\/subzero-20161108_140621_edited-RR.jpg 1080w\" sizes=\"auto, (max-width: 680px) 100vw, 680px\" \/><\/p>\n<p><strong>Thermomass y Ram Construction<\/strong> se asociaron para desarrollar un plan integral de envolvente del edificio para esta innovadora instalaci\u00f3n.<\/p>\n<p>Ram Construction, con sede en Delta, Columbia Brit\u00e1nica, est\u00e1 a punto de terminar lo que se considera el primer proyecto de c\u00e1mara frigor\u00edfica con paredes prefabricadas y aislamiento integral en el oeste de Canad\u00e1. El proyecto, denominado Subzero Cold Logistics, ser\u00e1 el edificio m\u00e1s nuevo del parque empresarial Campbell Heights, de 1.900 acres, ubicado en Surrey, Columbia Brit\u00e1nica. Curiosamente, Ram Construction construy\u00f3 la primera instalaci\u00f3n de Campbell Heights en 2004.<\/p>\n<p>La construcci\u00f3n con paneles prefabricados (tilt-up) ha sido durante mucho tiempo un m\u00e9todo de construcci\u00f3n de confianza en el oeste de Canad\u00e1, y las recientes actualizaciones de los c\u00f3digos de eficiencia energ\u00e9tica han consolidado a\u00fan m\u00e1s las envolventes de paredes s\u00e1ndwich como una opci\u00f3n ideal para los propietarios que buscan una mayor eficiencia energ\u00e9tica, durabilidad y control de la humedad. Sin embargo, hasta este proyecto, los almacenes con temperatura controlada segu\u00edan construy\u00e9ndose habitualmente utilizando \u00fanicamente paneles met\u00e1licos aislantes (IMP) o paredes prefabricadas con paneles IMP aplicados posteriormente.<\/p>\n<p>Thermomass y Ram Construction se asociaron para presentar una propuesta al propietario del proyecto, Todd Ko, presidente de Radius Transport, con el fin de demostrar c\u00f3mo los muros prefabricados aislados pod\u00edan mantener la temperatura de consigna prevista de -4 \u00b0F (-20 \u00b0C) mediante un montaje continuo de borde a borde, utilizando el aislamiento Thermomass System NC y las barreras t\u00e9rmicas Tigerloc y OHLoc de JK Thermal Solutions. El equipo tambi\u00e9n ilustr\u00f3 una amplia gama de beneficios adicionales en materia de estructura, aislamiento t\u00e9rmico, control de humedad y mantenimiento asociados con la construcci\u00f3n de paneles prefabricados aislados.<\/p>\n<p>Tras revisar la informaci\u00f3n y los an\u00e1lisis proporcionados, Ko visit\u00f3 varios congeladores con aislamiento Thermomass en el oeste de Estados Unidos para hablar sobre las ventajas de las paredes s\u00e1ndwich de construcci\u00f3n tilt-up con los actuales propietarios y operadores de instalaciones similares. Convencido de la eficiencia energ\u00e9tica, la mayor durabilidad y los menores costos de mantenimiento de la construcci\u00f3n tilt con aislamiento integral, as\u00ed como del servicio y el apoyo experimentados de Ram Construction y Thermomass, Ko estaba ansioso por seguir adelante con el nuevo edificio y el m\u00e9todo de construcci\u00f3n, nuevo en la zona.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-8996\" src=\"http:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2018\/01\/subzero-20170413_135520_edited-R-300x225.jpg\" alt=\"\" width=\"680\" height=\"510\" srcset=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2018\/01\/subzero-20170413_135520_edited-R-300x225.jpg 300w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2018\/01\/subzero-20170413_135520_edited-R-768x576.jpg 768w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2018\/01\/subzero-20170413_135520_edited-R-1024x768.jpg 1024w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2018\/01\/subzero-20170413_135520_edited-R.jpg 1080w\" sizes=\"auto, (max-width: 680px) 100vw, 680px\" \/><\/p>\n<p>\u201cA todos nos impresion\u00f3 la investigaci\u00f3n que Todd llev\u00f3 a cabo para seleccionar los paneles s\u00e1ndwich aislantes de montaje inclinado para sus nuevas instalaciones\u201d, afirm\u00f3 Jeff Knoblauch, presidente de Ram Construction. \u201cSe implic\u00f3 mucho desde el principio y se esforz\u00f3 por informarse sobre el proceso de construcci\u00f3n, el aislamiento integral continuo y c\u00f3mo otros propietarios, tanto en Canad\u00e1 como en Estados Unidos, hab\u00edan aprovechado al m\u00e1ximo los productos y el soporte t\u00e9cnico de proveedores l\u00edderes en la industria como JK Thermal Solutions y Thermomass\u201d.\u201d<\/p>\n<p>\u201cLas paredes s\u00e1ndwich de hormig\u00f3n son la opci\u00f3n ideal para ese mercado\u201d, coincidi\u00f3 Mitch McCaulley, director de ventas para Norteam\u00e9rica de Thermomass. \u201cSolo hac\u00eda falta un propietario que buscara una soluci\u00f3n \u00f3ptima para la envolvente del edificio y un contratista con experiencia, como Ram Construction, que conozca a la perfecci\u00f3n los detalles y la construcci\u00f3n de paneles inclinados aislados. Estamos seguros de que el proyecto de Subzero Cold Logistics ser\u00e1 solo el primero de muchos proyectos de paneles inclinados aislados para bajas temperaturas en el oeste de Canad\u00e1 en el futuro\u201d.\u201d<\/p>","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\">Thermomass and Ram Construction partnered to develop a comprehensive building envelope plan for the ground-breaking facility. Ram Construction, headquartered in Delta, British Columbia, is nearing completion of what is thought to be the first integrally <a class=\"mh-excerpt-more\" href=\"https:\/\/tilt-up.org\/tilt-uptoday\/es\/2018\/01\/11\/first-insulated-tilt-up-freezer-in-british-columbia-nearing-completion\/\" title=\"El primer congelador con sistema \u00abtilt-up\u00bb y aislamiento de Columbia Brit\u00e1nica est\u00e1 a punto de completarse\"> Leer m\u00e1s\u2026<\/a><\/div>","protected":false},"author":6,"featured_media":9000,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,29],"tags":[],"class_list":{"0":"post-8993","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-industry","8":"category-news"},"_links":{"self":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts\/8993","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/comments?post=8993"}],"version-history":[{"count":6,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts\/8993\/revisions"}],"predecessor-version":[{"id":19287,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts\/8993\/revisions\/19287"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/media\/9000"}],"wp:attachment":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/media?parent=8993"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/categories?post=8993"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/tags?post=8993"}],"curies":[{"name":"la hora de","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}