{"id":2832,"date":"2006-07-01T11:05:43","date_gmt":"2006-07-01T16:05:43","guid":{"rendered":"http:\/\/72.167.124.155\/tilt-uptoday\/?p=2832"},"modified":"2015-06-09T09:17:07","modified_gmt":"2015-06-09T14:17:07","slug":"tilt-up-provides-building-solutions-for-todays-religious-institutions","status":"publish","type":"post","link":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/2006\/07\/01\/tilt-up-provides-building-solutions-for-todays-religious-institutions\/","title":{"rendered":"La construcci\u00f3n Tilt-Up ofrece soluciones arquitect\u00f3nicas para las instituciones religiosas actuales"},"content":{"rendered":"<p><em>By: Jim Baty, Tilt-Up Concrete Association<\/em><\/p>\n<p>Today\u2019s congregations face many of the same building challenges homeowners and businesses face \u2013 rising cost and availability of land, increasing construction costs, and high maintenance costs. To counter these obstacles, it is essential to select a construction method for new facilities that is both cost- effective during construction and has low long-term costs. Site cast Tilt-Up \u2013 a construction method in which concrete wall panels are cast on-site and tilted into place \u2013 has proven attributes of durability and low maintenance costs. Design and construction of religious facilities requires a delicate balance of speed, economy and creativity. Tilt-Up has\u00a0met this challenge through its ability to provide architectural freedom, durability and security, as well as efficient and cost-effective solutions for today\u2019s churches.<\/p>\n<p>Solving Budget Issues for St. Julia\u2019s A new building for St. Julia\u2019s Catholic Church in Siler City, N.C., was originally designed as a load- bearing masonry structure. But when the shape and height of\u00a0the walls presented budget and constructability issues, the architect converted the project to Tilt-Up. Changing the design to include load-bearing insulating panels gave designers the freedom they needed to construct the 11,000-square- foot facility while resolving budget concerns.<\/p>\n<p>The owner and architect\u2019s vision for St. Julia\u2019s was a Southwestern mission-style church, including a classic mission bell tower. Because one wall of the bell tower was designed to be sloped, traditional masonry could not accommodate the plan without expensive structural steel backup. The project\u2019s Tilt-Up contractor, Centurion Construction Company of Raleigh, N.C., cast panels for the bell tower, which resulted in time and money savings.<\/p>\n<p>Space was very limited on the site, so all the panels were constructed either on the floor slab or on small casting beds. Still, this solution did not allow for enough space, so panels were stack cast and built in the proper erection sequence.<\/p>\n<p>To create a visual appeal for the facility, heavy architectural reveals were used for shadow, and textured paint was used to resemble a plaster finish. Engineered wood beams and a tongue-and-groove wood ceiling in the sanctuary create a striking interior. Stained glass windows add a unique element to the facility. The bell tower is comprised of panels with one laid on the other to create the appearance that the tower is leaning. And, the use of insulated concrete panels allowed the owner to have the desired look while receiving cost and energy savings.<\/p>\n<p>With a new facility in place, St. Julia\u2019s experienced the success Tilt-Up can bring to a project. With the use of Tilt-Up, St. Julia\u2019s new building construction remained under budget and fulfilled the vision of both the architect and owner.<\/p>\n<p><strong>CREATING NATIVE STONE\u00a0FINISH FOR ST. SARKIS<\/strong><\/p>\n<p>A dream-come-true for the congregation of St. Sarkis Armenian Church in Charlotte, N.C., the new 15,000-square-foot facility utilized Tilt-Up because the method could provide a faux stone finish, reduce construction costs and offer thermal efficiency through insulated panels. In fact, Tilt-Up provided the only viable option for the aesthetic features the congregation desired for their new building.<\/p>\n<p>The church congregation wanted their new facility to resemble the tuffa stone native to Armenia, but a true stone building would have doubled the cost of construction, and an EFIS solution would not have provided the desired durability. To create the stone look, more\u00a0than 10,000 feet of reveals create decorative patterns in the concrete that mimic a stone building. Lining up the reveals from panel to panel to create the natural stone look was essential in keeping the symmetrical patterns that give the church its unique stone finish. A customized paint color was designed for the building\u2019s exterior to match the Armenian stone. Three colors of Stone Tex, which is a version of Tex- Cote paint, were used to give the illusion of texture.<\/p>\n<p>Adding to the architectural composition of the building are arched openings created using Styrofoam blocks to cut the proper radius. The arched windows and entrances add to the church\u2019s many distinctive features.<\/p>\n<p>Not only does this project represent architectural achievements, it also exemplifies a contractor\u2019s ability to overcome construction obstacles. Before construction could begin, the building\u2019s location on the construction site had to be changed. This resulted in many changes, including the Tilt-Up panel sequence, crane access and blueprint modifications. After many delays, construction was finally ready\u00a0to begin just as winter arrived in Charlotte. The excessive cold weather that Charlotte\u2019s winter season brought proved to be a challenge in pouring concrete. The concrete pours needed to be rescheduled many times, but precautions were taken on days the team was able to pour the concrete. Hot water was used in the concrete mixes, and curing blankets were used to cover the concrete and protect it from freezing temperatures.<\/p>\n<p>To minimize drilling and cutting of the concrete, boxes for electrical wiring devices were installed in the panels during the casting process. In addition to the wiring boxes, all electric features, switches, lights and alarms were placed into the panels to avoid cutting them into the panels, which saved the congregation time and money. Located on a tight site, casting beds took up much of the construction location, so precise\u00a0coordination of the casting bed placement and the panel erection sequence was necessary. Other trades also used the casting beds for lay-down staging areas and fabrication because the construction site was so wet from rain.<\/p>\n<p>Contractor Seretta Construction Mid-Atlantic of Charlotte erected 40 Tilt-Up panels, with the tallest panel reaching 39 feet, 3 inches high. The largest panel weighs approximately 81,600 pounds. The panels measure 11.25 inches, with 3 inches for the outer wythe, 2 inches of insulation and 6.25 inches of structural concrete. The two inches of insulation placed in the panels create an R-11 value, which will minimize operating costs for the church. The interior sides of the panels are exposed concrete and are finished with a flecked hard-trowel finish, avoiding costs associated with interior metal studs, insulation and gypsum board.<\/p>\n<p>Since the construction of the new facility for St. Sarkis, individuals have driven from as far away as Charleston, S.C., to be part of this church. Some families have even relocated to Charlotte to worship at St. Sarkis. The synergy and creativity used in the construction process give the church congregation the unique\u00a0building look they desired. The faux stone finish not only stands out in Charlotte, but also is recognized as an achievement in the Tilt-Up community.<\/p>\n<p><strong>PROVIDING VERSATILITY FOR FIRST BAPTIST CHURCH OF INDIAN ROCKS<\/strong><\/p>\n<p>With a growing congregation, First Baptist Church of Indian Rocks in Largo, Fla., needed a new 3,000-seat sanctuary with major audio and video performance enhancements. The church congregation had been meeting in a multipurpose space\u00a0on their campus but had realized a need for the addition of a worship center. Construction goals for the new worship center included accommodating future growth needs while remaining within budget\u00a0and producing a well-constructed building. Tilt-Up provided the most viable and economic solution for the 60,000-square-foot permanent worship facility. In addition, the architectural applications used on this project enabled church directors to get a unique look for their new building.<\/p>\n<p>The exterior tilt walls used horizontal reveals and recesses to create the church directors\u2019 desired look. After Seretta Construction of Apopka, Fla., erected the walls, the exterior was painted with accenting neutral colors to create a dramatic appearance for the church. Aesthetic features include 23,000 feet of reveals with numerous three-quarter inch recesses. Perhaps the most remarkable feature of Indian Rocks Baptist Church is the stainless-steel cross that stands 80 feet above the finished floor. To mount the cross, a 10-foot by 10- foot by 1-foot, 6.75-inch protrusion wall was built above the finished\u00a0floor. The cross was attached to two panels in which Seretta\u2019s team had to build an 18.75-inch protrusion with a top elevation of 41 feet above the finished floor. The back of the sanctuary is constructed on\u00a0a segmented radius, creating the illusion of a curvilinear building.<\/p>\n<p>The limited site access, panel erection sequence and weather brought challenges to the project\u2019s construction. To battle the limited site access and extensive underground utilities, coordination with multiple trades for the casting layout of the Tilt-Up panels was necessary. Careful planning was also needed to place the deadmen without interfering with the casting and lifting of the panels. A Manitowoc 888 Series\u00a02 crane picked up the panels and walked them to their final positions because of the limited site access. The tallest panels reached 58 feet, 7 inches, with the majority of the panels measuring 45 feet, 1 inch tall. Constructed during a particularly active hurricane season, three hurricanes passed through the area after the panels were placed and braced, waiting for the structural steel to be installed.<\/p>\n<p>With its curvilinear design at the sanctuary\u2019s rear and its unique architectural features, First Baptist Church of Indian Rocks demonstrates\u00a0Tilt-Up\u2019s versatility in meeting the needs of church congregations. Despite the challenges, the construction of First Baptist of Indian Rocks proves Tilt-Up\u2019s ability to solve problems in today\u2019s church construction.<\/p>\n<p>Fostering a Sense of Community Religious facilities are important to maintaining a strong community. Offering the attributes of durability, long-term value and aesthetics, Tilt- Up construction appeals to the sense of value and fiscal accountability required to manage a religious institution. Further, the inherent excitement that surrounds the lifting of Tilt-Up panels is something that the entire congregation can enjoy.<\/p>","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\">Por: Jim Baty, Asociaci\u00f3n de Hormig\u00f3n Tilt-Up Las congregaciones de hoy en d\u00eda se enfrentan a muchos de los mismos retos de construcci\u00f3n que afrontan los propietarios de viviendas y las empresas: el aumento del precio y la escasez de terrenos, el incremento de los costos de construcci\u00f3n y los elevados gastos de mantenimiento. Para contrarrestar <a class=\"mh-excerpt-more\" href=\"https:\/\/tilt-up.org\/tilt-uptoday\/es\/2006\/07\/01\/tilt-up-provides-building-solutions-for-todays-religious-institutions\/\" title=\"La construcci\u00f3n Tilt-Up ofrece soluciones arquitect\u00f3nicas para las instituciones religiosas actuales\"> Leer m\u00e1s\u2026<\/a><\/div>","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[26,118],"class_list":{"0":"post-2832","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-uncategorized","7":"tag-architecture","8":"tag-tilt-up"},"_links":{"self":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts\/2832","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/comments?post=2832"}],"version-history":[{"count":13,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts\/2832\/revisions"}],"predecessor-version":[{"id":7670,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts\/2832\/revisions\/7670"}],"wp:attachment":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/media?parent=2832"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/categories?post=2832"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/tags?post=2832"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}