{"id":19951,"date":"2026-01-29T21:00:43","date_gmt":"2026-01-30T02:00:43","guid":{"rendered":"https:\/\/tilt-up.org\/tilt-uptoday\/?p=19951"},"modified":"2026-01-29T21:02:12","modified_gmt":"2026-01-30T02:02:12","slug":"curved-geometry-and-vertical-scale-in-healthcare-tilt-up-construction","status":"publish","type":"post","link":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/2026\/01\/29\/curved-geometry-and-vertical-scale-in-healthcare-tilt-up-construction\/","title":{"rendered":"Geometr\u00eda curva y escala vertical en un centro sanitario de varias plantas"},"content":{"rendered":"<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-010-lg-1024x683.jpg\" alt=\"\" class=\"wp-image-19952\" style=\"aspect-ratio:16\/9;object-fit:cover\" srcset=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-010-lg-1024x683.jpg 1024w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-010-lg-300x200.jpg 300w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-010-lg-768x512.jpg 768w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-010-lg-1536x1024.jpg 1536w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-010-lg-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The Centura St. Francis Hospital \u2013 Interquest project in Colorado Springs, Colorado, is a 140,000-square-foot, four-story hospital developed to support a rapidly growing regional population. Recognized through the Tilt-Up Achievement Awards program, the project serves as a case study in the application of tilt-up concrete construction to a complex healthcare facility that combines curved geometry, multi-story organization, and demanding programmatic requirements.<\/p>\n\n\n\n<p>Tilt-up construction was selected to support schedule efficiency and cost control while accommodating a full-service hospital program that includes emergency care, surgery, inpatient services, and critical care units. The building departs from conventional rectilinear hospital forms, instead organizing significant portions of the structure along a curved plan that required careful coordination between architectural intent, structural design, and erection sequencing.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Curved panel geometry and foundation conditions<\/h3>\n\n\n\n<p>The structure incorporated 86 tilt-up wall panels totaling approximately 64,000 square feet of wall area. Many of the panels were arranged in a half-circle configuration, establishing a continuous curved elevation that defines the facility\u2019s architectural character. Achieving this geometry required precise control of panel dimensions, alignment, and erection tolerances to maintain continuity across the curved fa\u00e7ade.<\/p>\n\n\n\n<p>Panel support conditions varied across the building footprint. Approximately half of the panels were erected on continuous foundations, while the remaining panels were supported by a basement retaining wall. This condition required coordinated detailing and sequencing to ensure consistent performance across differing foundation systems while maintaining the intended curvature of the exterior envelope.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"19953\" src=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-011-lg-1024x683.jpg\" alt=\"\" class=\"wp-image-19953\" srcset=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-011-lg-1024x683.jpg 1024w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-011-lg-300x200.jpg 300w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-011-lg-768x512.jpg 768w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-011-lg-1536x1024.jpg 1536w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-011-lg-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"691\" data-id=\"19954\" src=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-012-lg-1024x691.jpg\" alt=\"\" class=\"wp-image-19954\" srcset=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-012-lg-1024x691.jpg 1024w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-012-lg-300x203.jpg 300w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-012-lg-768x519.jpg 768w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-012-lg-1536x1037.jpg 1536w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-012-lg-2048x1383.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Tall vertical elements and multi-story organization<\/h3>\n\n\n\n<p>The project included elevator core panels extending to 94 feet 6 inches in height, representing the tallest tilt-up panels constructed in Colorado at the time and ranking among the tallest nationally. These panels supported the building\u2019s four-story configuration and consolidated vertical circulation within the tilt-up structural system. Five-story elevator core panels further demonstrated tilt-up\u2019s capacity to accommodate significant vertical scale within a healthcare application.<\/p>\n\n\n\n<p>Rather than increasing complexity through excessive segmentation, the use of tall panels reduced the overall number of elements required to achieve the building enclosure. Panel design incorporated multiple pick-up points to manage lifting forces and support controlled placement consistent with established large-panel tilt-up practices.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Construction execution and architectural expression<\/h3>\n\n\n\n<p>Construction progressed under variable weather conditions typical of the Colorado Springs region, including cold temperatures, wind, and snow. Tilt-up construction supported efficient sequencing and rapid enclosure, helping maintain progress while accommodating seasonal conditions.<\/p>\n\n\n\n<p>Architecturally, the panels featured a flat painted finish with reveals used to articulate the fa\u00e7ade and reinforce the building\u2019s curved form. Insulation was post-applied on the interior, supporting healthcare performance requirements while maintaining flexibility during casting and erection.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"19955\" src=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-006-lg-1024x683.jpg\" alt=\"\" class=\"wp-image-19955\" srcset=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-006-lg-1024x683.jpg 1024w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-006-lg-300x200.jpg 300w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-006-lg-768x512.jpg 768w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-006-lg-1536x1024.jpg 1536w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/2023-st-francis-006-lg-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"19956\" src=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/St-francis-001-lg-1024x683.jpg\" alt=\"\" class=\"wp-image-19956\" srcset=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/St-francis-001-lg-1024x683.jpg 1024w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/St-francis-001-lg-300x200.jpg 300w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/St-francis-001-lg-768x512.jpg 768w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/St-francis-001-lg-1536x1024.jpg 1536w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2026\/01\/St-francis-001-lg-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Broader relevance and community impact<\/h3>\n\n\n\n<p>The completed facility includes 72 inpatient beds, 10 intensive care unit beds, 10 specialty-sized operating rooms, and a 14-bed emergency department. Imaging services include computed tomography and ultrasound, supporting a full range of acute care functions. At full operation, the hospital is expected to support approximately 300 jobs, expanding access to medical services in the greater Colorado Springs area.<\/p>\n\n\n\n<p>From an industry perspective, the project demonstrates how tilt-up concrete construction can be applied to healthcare facilities that require curved geometry, multi-story organization, and substantial vertical elements. The project contributes to the broader understanding of tilt-up as a scalable construction system capable of addressing architectural and programmatic demands typically associated with institutional buildings.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Cr\u00e9ditos del proyecto<\/strong><\/h3>\n\n\n\n<p>Concrete Contractor: Suntec Concrete<br>Photographer: Small Giants<\/p>\n\n\n\n<p><em>Este art\u00edculo se ha elaborado a partir del contenido presentado durante el programa de los Premios Tilt-Up Achievement.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\">Este hospital de cuatro pisos situado en Colorado Springs es un ejemplo del uso del hormig\u00f3n prefabricado en un proyecto sanitario de varios pisos con formas curvas. El proyecto muestra c\u00f3mo se pueden abordar los paneles de gran altura y las condiciones variables de los cimientos mediante un dise\u00f1o coordinado de los paneles y estrategias de montaje.<\/div>\n<p> <a class=\"mh-excerpt-more\" href=\"https:\/\/tilt-up.org\/tilt-uptoday\/es\/2026\/01\/29\/curved-geometry-and-vertical-scale-in-healthcare-tilt-up-construction\/\" title=\"Geometr\u00eda curva y escala vertical en un centro sanitario de varias plantas\"> Leer m\u00e1s\u2026<\/a><\/p>","protected":false},"author":3,"featured_media":19954,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[366,371,478],"tags":[516,514,503,520,518,519,515,517],"class_list":{"0":"post-19951","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-architecture-design","8":"category-award-winners","9":"category-cost-schedule-risk","10":"tag-curved-panel-geometry","11":"tag-healthcare-construction","12":"tag-institutional-buildings","13":"tag-large-format-panels","14":"tag-multi-story-tilt-up","15":"tag-panel-erection-sequencing","16":"tag-tall-tilt-up-panels","17":"tag-vertical-circulation"},"_links":{"self":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts\/19951","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/comments?post=19951"}],"version-history":[{"count":2,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts\/19951\/revisions"}],"predecessor-version":[{"id":19958,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts\/19951\/revisions\/19958"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/media\/19954"}],"wp:attachment":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/media?parent=19951"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/categories?post=19951"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/tags?post=19951"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}