{"id":18187,"date":"2025-02-25T15:10:23","date_gmt":"2025-02-25T20:10:23","guid":{"rendered":"https:\/\/tilt-up.org\/tilt-uptoday\/?p=18187"},"modified":"2025-06-17T14:24:19","modified_gmt":"2025-06-17T19:24:19","slug":"lake-city-way-un-estudio-sobre-la-innovacion-en-la-construccion-de-tilt-up","status":"publish","type":"post","link":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/2025\/02\/25\/lake-city-way-un-estudio-sobre-la-innovacion-en-la-construccion-de-tilt-up\/","title":{"rendered":"Lake City Way: Un estudio sobre la innovaci\u00f3n en la construcci\u00f3n de tilt-up"},"content":{"rendered":"<div style=\"border: 1px solid #dddddd; padding: 0.5em; background-color: #f5f5f5; width: 666px;\">\n<p style=\"text-align: center; color: #808285;\"><a href=\"https:\/\/tilt-up.org\/tilt-uptoday\/es\/2025\/02\/25\/lake-city-way-a-study-in-tilt-up-construction-innovation\/\"><strong>Ingl\u00e9s<\/strong><\/a> | Traducci\u00f3n proporcionada por la TCA<\/p>\n<\/div>\n\n\n<p>Por: <strong>Kevin Lemieux,<\/strong> P.Eng, Struct.Eng, Principal,\u00a0<\/p>\n\n\n\n<p><strong>Weiler Smith<\/strong> Bowers Consulting Structural Engineers and&nbsp;<\/p>\n\n\n\n<p><strong>Dylan Bilinsky<\/strong>, Operations Manager, RiteTech Construction Ltd.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"634\" src=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/32.jpg-1024x634.jpg\" alt=\"\" class=\"wp-image-18178\" srcset=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/32.jpg-1024x634.jpg 1024w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/32.jpg-300x186.jpg 300w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/32.jpg-768x476.jpg 768w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/32.jpg-1536x952.jpg 1536w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/32.jpg.jpg 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<p>El proyecto Lake City Way en Burnaby, British Columbia, es un logro significativo en la aplicaci\u00f3n de t\u00e9cnicas de construcci\u00f3n de tilt-up para desarrollos a gran escala. Compuesto por 21 escenarios de sonido de estudio de cine avanzados, el proyecto integra paneles tilt-up con dos niveles de estacionamiento subterr\u00e1neo y talleres de producci\u00f3n construidos con concreto colado en el lugar (CIP) y losas suspendidas. La ejecuci\u00f3n del proyecto resalta una ingenier\u00eda rigurosa y una planificaci\u00f3n cuidadosa, abordando los desaf\u00edos estructurales y log\u00edsticos.<\/p>\n\n\n\n<p>Ubicadas a 20 minutos del centro de Vancouver y a 30 minutos del aeropuerto, las instalaciones de Lake City Studios abarcan un sitio de 18.6 acres. Los 21 escenarios de sonido de la instalaci\u00f3n, incluido uno de los m\u00e1s grandes del oeste de Canad\u00e1 con un tama\u00f1o de casi un acre, ofrecen una variedad de alturas de techo y configuraciones para satisfacer diversas necesidades de producci\u00f3n. Las pr\u00e1cticas sostenibles son fundamentales para el proyecto, con energ\u00eda hidroel\u00e9ctrica renovable que alimenta las instalaciones y sistemas dedicados al reciclaje y la gesti\u00f3n de residuos. El estacionamiento subterr\u00e1neo para m\u00e1s de 1,000 veh\u00edculos y una milla de estacionamiento adyacente para veh\u00edculos de producci\u00f3n garantizan la eficiencia operativa. El campus est\u00e1 estrat\u00e9gicamente situado junto al sistema de tr\u00e1nsito r\u00e1pido Skytrain, lo que proporciona una mejor accesibilidad.<\/p>\n\n\n\n<p>Programado para abrir en el verano de 2025, el campus planificado incluye amplias instalaciones de producci\u00f3n, como talleres, almacenamiento de utiler\u00eda y \u00e1reas de construcci\u00f3n de vestuario con luz natural. Con siete oficinas de producci\u00f3n que comprenden m\u00e1s de 100,000 pies cuadrados, el desarrollo fomenta un entorno de colaboraci\u00f3n al ubicar numerosos negocios relacionados con el cine.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/2024.02.23-ml-1024x576.jpg\" alt=\"\" class=\"wp-image-18181\" srcset=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/2024.02.23-ml-1024x576.jpg 1024w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/2024.02.23-ml-300x169.jpg 300w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/2024.02.23-ml-768x432.jpg 768w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/2024.02.23-ml-1536x864.jpg 1536w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/2024.02.23-ml-640x360.jpg 640w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/2024.02.23-ml.jpg 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<p><strong>Dise\u00f1o y planificaci\u00f3n funcional<\/strong><\/p>\n\n\n\n<p>El proyecto Lake City Way fue dise\u00f1ado para optimizar la eficiencia espacial al tiempo que aborda los requisitos espec\u00edficos de la industria de la producci\u00f3n cinematogr\u00e1fica. Las limitaciones del sitio inclu\u00edan una pendiente inclinada, contratiempos ambientales y proximidad a la infraestructura de tr\u00e1nsito r\u00e1pido. El desarrollo cuenta con dos estructuras principales: un edificio en forma de L con seis escenarios de sonido de 50 pies libres, dos escenarios de sonido de 30 pies libres y un bloque de oficinas contiguo de tres pisos, y un edificio rectangular con diez escenarios de sonido de 40 pies libres y tres escenarios inferiores adicionales de 35 pies libres. Estos edificios est\u00e1n soportados por hasta dos niveles de un aparcamiento subterr\u00e1neo combinado y un espacio para talleres.<\/p>\n\n\n\n<p>La construcci\u00f3n de tilt-up fue seleccionada por sus beneficios estructurales, propiedades ac\u00fasticas y capacidad para cumplir con cronogramas de construcci\u00f3n estrictos. Los paneles, adaptados a los requisitos del escenario sonoro, proporcionan un aislamiento y una durabilidad esenciales, lo que garantiza la funcionalidad a largo plazo.<\/p>\n\n\n\n<p><strong>Integraci\u00f3n de t\u00e9cnicas constructivas<\/strong><\/p>\n\n\n\n<p>El proyecto requiri\u00f3 tres a\u00f1os de planificaci\u00f3n, seguidos de una fase de construcci\u00f3n de tilt-up de 14 meses. La fase general de construcci\u00f3n es de unos 3 a\u00f1os. Los paneles de tilt-up se integraron con sistemas CIP y de losas suspendidas, ancladas a las losas mediante placas de acero incrustadas. Este enfoque proporcion\u00f3 estabilidad al tiempo que manten\u00eda la flexibilidad necesaria para las condiciones complejas del sitio.<\/p>\n\n\n\n<p>Para abordar los desaf\u00edos espec\u00edficos del sitio, se coloc\u00f3 una gr\u00faa por debajo del nivel del suelo, utilizando el espacio entre los edificios como una carretera temporal. Esta estrategia innovadora minimiz\u00f3 la necesidad de una relocalizaci\u00f3n extensa y permiti\u00f3 un montaje eficiente de los paneles, lo que garantiz\u00f3 el cumplimiento del cronograma de construcci\u00f3n.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/IMG_6180-ml-1024x768.jpg\" alt=\"\" class=\"wp-image-18183\" srcset=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/IMG_6180-ml-1024x768.jpg 1024w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/IMG_6180-ml-300x225.jpg 300w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/IMG_6180-ml-768x576.jpg 768w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/IMG_6180-ml-1536x1152.jpg 1536w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/IMG_6180-ml.jpg 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<p><strong>Desaf\u00edos estructurales y soluciones<\/strong><\/p>\n\n\n\n<p>Los paneles de tilt-up del proyecto, algunos alcanzando alturas de 65 pies y pesando hasta 148,000 libras, plantearon desaf\u00edos de ingenier\u00eda importantes. Construidos sobre losas suspendidas, estos paneles requirieron un apilamiento preciso y un reforzamiento selectivo para acomodar pesos superiores a 300 libras por pie cuadrado.<\/p>\n\n\n\n<p>Durante el montaje, se emplearon sistemas de arriostramiento robustos para mantener la estabilidad del panel. Las riostras, que se extienden hasta 52 pies, se anclaron a la losa del piso estructural y permanecieron en su lugar hasta que la estructura del techo proporcion\u00f3 soporte adicional. Este m\u00e9todo garantiz\u00f3 la seguridad y la integridad estructural durante todo el proceso de construcci\u00f3n.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1002\" src=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/IMG_5985-ml-1024x1002.jpg\" alt=\"\" class=\"wp-image-18185\" srcset=\"https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/IMG_5985-ml-1024x1002.jpg 1024w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/IMG_5985-ml-300x294.jpg 300w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/IMG_5985-ml-768x752.jpg 768w, https:\/\/tilt-up.org\/tilt-uptoday\/wp-content\/uploads\/2025\/02\/IMG_5985-ml.jpg 1500w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<p><strong>Coordinaci\u00f3n y secuenciaci\u00f3n de oficios<\/strong><\/p>\n\n\n\n<p>La complejidad del proyecto de Lake City Way requiri\u00f3 una coordinaci\u00f3n meticulosa entre m\u00faltiples oficios. A lo largo de seis fases de levantamiento que abarcaron 14 meses, los equipos navegaron por horarios superpuestos, limitaciones de acceso al sitio y retrasos relacionados con el clima. Las reuniones semanales de coordinaci\u00f3n facilitaron la alineaci\u00f3n entre el contratista CIP, los especialistas en tilt-up y los equipos de acero estructural.<\/p>\n\n\n\n<p>Las sesiones informativas de seguridad previas al levantamiento y la planificaci\u00f3n adaptativa abordaron los riesgos potenciales y garantizaron un progreso sin problemas. Los desaf\u00edos, como la gesti\u00f3n de las \u00e1reas de descanso y la optimizaci\u00f3n de las rutas de acceso, se resolvieron a trav\u00e9s de la comunicaci\u00f3n y la colaboraci\u00f3n continuas.<\/p>\n\n\n\n<p><strong>Consideraciones arquitect\u00f3nicas y medioambientales<\/strong><\/p>\n\n\n\n<p>El proyecto Lake City Way demuestra c\u00f3mo la construcci\u00f3n de tilt-up puede cumplir con los objetivos arquitect\u00f3nicos y ambientales. La durabilidad y los bajos requisitos de mantenimiento de los paneles se alinean con los objetivos de sostenibilidad, mientras que el uso de energ\u00eda hidroel\u00e9ctrica y sistemas de reciclaje reduce a\u00fan m\u00e1s el impacto ambiental del proyecto.<\/p>\n\n\n\n<p>Arquitect\u00f3nicamente, el dise\u00f1o integra elementos funcionales y est\u00e9ticos, incluyendo espacios de trabajo con luz natural y escenarios sonoros amplios. La inclusi\u00f3n de empresas relacionadas con el cine dentro del campus fomenta un ecosistema colaborativo, apoyando tanto la creatividad como el crecimiento de la industria.<\/p>\n\n\n\n<p><strong>Impacto e implicaciones para proyectos futuros<\/strong><\/p>\n\n\n\n<p>El proyecto Lake City Way destaca la adaptabilidad de la construcci\u00f3n de tilt-up para desarrollos complejos a gran escala. Su implementaci\u00f3n exitosa demuestra la importancia de la planificaci\u00f3n temprana, las soluciones de ingenier\u00eda innovadoras y la colaboraci\u00f3n interdisciplinaria. Estas lecciones pueden informar proyectos futuros, enfatizando el valor de integrar metodolog\u00edas de construcci\u00f3n avanzadas con pr\u00e1cticas sostenibles.<\/p>\n\n\n\n<p>Al abordar diversos desaf\u00edos y establecer nuevos est\u00e1ndares de eficiencia y funcionalidad, el proyecto Lake City Way subraya el potencial transformador de la construcci\u00f3n de tilt-up en el dise\u00f1o de edificios modernos.<\/p>","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\">English | Translation Provided by the TCA Por: Kevin Lemieux, P.Eng, Struct.Eng, Principal,\u00a0 Weiler Smith Bowers Consulting Structural Engineers and&nbsp; Dylan Bilinsky, Operations Manager, RiteTech Construction Ltd. El proyecto Lake City Way en Burnaby, British <a class=\"mh-excerpt-more\" href=\"https:\/\/tilt-up.org\/tilt-uptoday\/es\/2025\/02\/25\/lake-city-way-un-estudio-sobre-la-innovacion-en-la-construccion-de-tilt-up\/\" title=\"Lake City Way: Un estudio sobre la innovaci\u00f3n en la construcci\u00f3n de tilt-up\"> Leer m\u00e1s\u2026<\/a><\/div>","protected":false},"author":6,"featured_media":18178,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[267],"tags":[],"class_list":{"0":"post-18187","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-en-espanol"},"_links":{"self":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts\/18187","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/comments?post=18187"}],"version-history":[{"count":3,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts\/18187\/revisions"}],"predecessor-version":[{"id":18227,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/posts\/18187\/revisions\/18227"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/media\/18178"}],"wp:attachment":[{"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/media?parent=18187"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/categories?post=18187"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tilt-up.org\/tilt-uptoday\/es\/wp-json\/wp\/v2\/tags?post=18187"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}