Sephora

Project summary provided by submitting company.

This single story 713,366 sf Tilt Up is the Sephora distribution facility now serving the Southwest region of the United States. A 300 W backup generator was installed outside, adjacent to the interior emergency panel. Automated controls for all HVAC, plumbing, electrical, building management system and lighting controls were installed. The building is fully sprinkler ESFR monitored system, with separate exterior fire pump house and 2000 GPM fire pump feeding the system. A CMU scrubber dump area was installed inside the building, along with a 32 bay Battery Charging station with Epoxy Flooring & Maintenance Cage area. An Aerosol cage was installed for combustible supplies. The perimeter of the building site is lined with a 6’ steel picket fence with locking gates at employee areas and 8’ steel picket fence with secured guard shack at truck court area. Martin Harris contracted directly with Sephora’s national vendor, Vector Security, to coordinate and install the building security system. System included cameras at all designated areas and card access control throughout the entire building. Turnstiles and security desks were installed at main office area. The large break room includes multiple refrigerators, microwaves, ice makers, 800-locker system was provided for employees. Additional offices, conference room, break room and training room with operable partition were installed for Sephora management / office personnel. The warehouse office area includes a break room for warehouse personnel, truck drivers / deliveries. The project features 60 Dock Levelers / dock positions, equipped with state-of-the-art Rite Hite Dock Levelers, Coolman Trailer Fans, Rite Lite HD-LED Dock Lights, 3 large additional ramps with 12 x 14 OH door for deliveries.

 
Main banner image for Sephora

Project Location

Las Vegas, NV
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
 
Suppliers:
 
Photographer(s):

Project Specifics

Project Category:
Distribution
Building Types:
Finishes:
Concrete (Raw/Sealed)
Paint (Flat)
Features:
Interlocking Panels
Insulation:
Post Applied (Interior)
Environmental:
Number of Floors:
0
Number of Panels:
158 panels
Tilt-Up Wall Area:
188,968 sq ft (17,555 sq m)
Total Floor Area:
713,366 sq ft (66,272 sq m)
Tallest Panel:
46 ft 3 in (14.10 m)
Heaviest Panel:
112,000 lbs (50,802 kg)
Tallest Cantilever:
46 ft 3 in (14.10 m)
Longest Spandrel:
26 ft 0 in (7.92 m)