Stream world-class tilt-up education and training with an all-access subscription - just $17/month.
Already a subscriber? Login to access your content.
Duration: 45 minutes
Speaker: Derick Rainey
Are you an contractor, architect, or engineer involved in tilt-up construction? This session will discuss the function, application, and proper sequence of chemical products used in tilt-up construction. Understanding these chemicals is crucial to ensure high-quality panels, efficient methods, and reduced costs. We will delve into not only how these products function individually, but also how they interact with each other and the concrete itself. We will examine common products like bondbreakers, densifiers, curing compounds, and release agents, and how they fit into the overall tilt-up process.
Credits: 1 PDH/LU
Provider: Tilt-Up Concrete Association
Beneath the Surface - The Art of Exposed Aggregate
NEW 37 minutes | 0.5 PDH/LU
This film takes an inside look at the craft of exposed aggregate tilt-up panels, following the process from the job site to completed buildings. Led...
9 minutes
An investigation into the interplay of local materials and form, this project examines the inherent qualities of soil and rock as formative elements...
Achieving Net Zero Energy with Tilt Wall
50 minutes
We’ve moved on from a time when small consumer decisions like using compostable straws could be considered an adequate response to address climate...
Why is Slump Mandated in Project Specifications?
30 minutes
With the advances in concrete technology over the last 50 years, why is slump still being mandated in project specifications? This presentation will begin...
Better Materials, Better Designs, Better Ways to Build with Concrete
45 minutes
Design and construction professionals face significant challenges driven by increasing customer demands, rapidly changing material costs, strained supply...
Structural Engineering Challenges While Designing Tilt-Up Structures
53 minutes
This seminar will speak to of the challenges of structural design in tilt ups. Joining me in this presentation will include John Lawson, S.E. Together...
Building Psychological Safety to Address Mental Health
51 minutes | 1 PDH/LU
After two years, the stresses of a global pandemic have compounded the existing mental health challenges in the construction industry. According...
56 minutes | 1 PDH/LU
Needham DBS was called to investigate cracks on a building after years of issues. The building had a history of failed panel to slab connections and significant...
A Parametric Study of the New Diaphragm Design Force Methods
55 minutes | 1 PDH/LU
Since its introduction into U.S. building codes and standards, a single generally-accepted method has existed for determining seismic design forces on...
Safety Success through Proper Communication
42 minutes
This talk centers around the success Martin Concrete Construction has had with a bottom-up approach to safety culture. Specifically, this talk will discuss...