Continuing education credits for this course are currently unavailable. While you are welcome to view the course, credits will not be applied.
Stream world-class tilt-up education and training with an all-access subscription - just $17/month.
Already a subscriber? Login to access your content.
Duration: 58 Minutes
Speaker: Trent Nagele, P.E., S.E.
The design provisions in ACI 318 Section 11.8 are used for a large majority of tilt-up wall designs. However, they are presented as an “alternate” design method and can often be somewhat of an enigma to new or even experienced designers. Based on the ACI 551.2R design guide updates currently being edited by ACI 551 and the recently published Concrete International article, “Tilt-up Design Pitfalls” (Feb 2024) and ACI PCR-551.3-21 Technote, this seminar will go behind the provisions to present historical background, calculation basis, pitfalls, and best practices in applying the code requirements in everyday design.

The Impact of Robotics on Workflow and Stakeholder Collaboration
NEW 73 minutes | 1.5 PDH/LU
New date is 2025-07-21
Start date is 2025-10-03

Mastering Architectural Concrete in Tilt-Up Construction
NEW 83 minutes | 1.5 PDH/LU
New date is 2025-07-21
Start date is 2025-10-03

From Pursuit to Punch List: A Collaborative Approach to Tilt-Up Delivery
NEW 83 minutes | 1.5 PDH/LU
New date is 2025-07-21
Start date is 2025-10-03

Managing Liability and Preventing Disputes in Tilt-Up
NEW 89 minutes | 1.5 PDH/LU
New date is 2025-07-21
Start date is 2025-10-03

Optimizing Concrete from Slab to Panel
NEW 52 minutes | 1 PDH/LU
New date is 2025-07-21
Start date is 2025-10-03

Latent Innovation and the Role of Collaborative Inquiry
NEW 75 minutes | 1.5 PDH/LU
New date is 2025-07-21
Start date is 2025-10-02

Economic Trends Impacting Tilt-Up in 2026 and Beyond
NEW 85 minutes | 1.5 PDH/LU
New date is 2025-07-21
Start date is 2025-10-02

Elevating Rock Nashville with Stacked Panels
NEW 64 minutes | 1.5 PDH/LU
New date is 2025-07-21
Start date is 2025-10-02

Mixing Expectations in a Type 1L Cement Landscape
NEW 61 minutes | 1.5 PDH/LU
New date is 2025-07-21
Start date is 2025-10-02