Bright House Networks

In order to meet a strict deadline, the project had to be ready for occupancy in just 12 months. Through the design-build approach, Tilt-Up was introduced as the solution to meet the building requirements and schedule. Tilt-Up provided a cost-effective means for the end-user to build and purchase a customized facility that would allow them to consolidate five separate divisions into one location instead of leasing a larger office building and paying the costs associated with interior build-out.

Innovative architectural applications allowed for a high quality Class A urban office building in a premier business park. Existing buildings in the park are traditional brick; however, this material was too expensive for the owner’s budget. Tilt-Up panels with cast-in-place thin brick afforded the owner an opportunity to build in an upscale business park while keeping with the development’s existing theme. False joints were created between each color of brick and corner return bricks were set on the outside edges of each corner panel and all window openings to achieve the look of a true brick building. Creating the false joints required eight brick cuts per row, which was an extremely labor intensive process and required flawless precision.

Special panel design was implemented to accommodate large openings for the internal loading docks. Single-legged panels with 34-foot wide openings were erected and placed at the pilaster of corner panels. Large openings and the height of the panels required strongbacks to provide extra support while standing the 70-ton panels. Trees on the site restricted full crane access around the building. Panels for the north side of the building had to be picked and walked backwards with the crane from the east side of the building.

 
Main banner image for Bright House Networks

Project Location

St Petersburg, FL 33716
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2005

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
Seretta Construction Inc
Architect:
 
Engineer:
Leviat
Suppliers:
Leviat
Photographer(s):

Project Specifics

Project Category:
Office
Building Types:
Finishes:
Features:
Insulation:
Environmental:
Number of Floors:
0
Total Floor Area:
166,000 sq ft (15,421 sq m)
Tallest Panel:
58 ft 0 in (17.68 m)
Largest Panel:
2,087 sq ft (193.9 sq m)
Heaviest Panel:
140,000 lbs (63,503 kg)