City of Woodland, Police Headquarters

As one of the nation’s first police facilities to be accepted for current review by the U.S. Green Building Council for LEED Silver Certification, the Woodland Police Headquarters effectively utilized materials, space and light, which reduced ongoing energy costs by 30 to 40 percent.

It was crucial that the facility used a brick façade to match the existing architecture of the community. As such, the MBrick Versa Liner provided the seamless and covered joint look that closely resembles the look provided by a mason, yet at a much lower cost.

The exterior arched accents and brick veneer finish were utilized to reflect the city’s architecture and to blend in with the historic rail yard that is nearby.

Tilt-Up was chosen for the facility because of its ability to provide enhanced explosion resistance of exterior walls and meet the tight construction schedule.

The design required sophisticated blending of several construction elements including exposed steel framework on the interior, Tilt-Up wall exterior, secure sally port detention access and high degrees of natural light. The distinctive “glass eyebrow” design at the roof level allows natural light transmission all the way to the lower floor through an atrium opening.

A tremendous success for spearheading the downtown community’s revitalization program, the project also was the winner of the PCBC 2005 Gold Nugget Awards Grand Award for Best Sustainable Commercial/Non-Residential Project category.

 
Main banner image for City of Woodland, Police Headquarters

Project Location

Woodland, CA 95695
United States

TILT-UP ACHIEVEMENT AWARD

The Tilt-Up Achievement Awards were established to honor projects that use site-cast tilt-up concrete to introduce new building types, advance industry technology and provide unique solutions to building programs. Winning entries illustrate the variety, beauty, and flexibility of tilt-up construction.

ACHIEVEMENT

2006

The world’s greatest tilt-up structures are featured by the TCA as Tilt-Up Achievement Award Winners. Learn more >

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team (TCA Members)

General Contractor:
 
Concrete Contractor:
 
Architect:
 
Engineer:
 
Suppliers:
Innovative Brick Systems LLC
Photographer(s):

Project Specifics

Project Category:
Building Types:
Finishes:
Features:
Insulation:
Environmental:
Number of Floors:
0
Total Floor Area:
52,300 sq ft (4,859 sq m)
Tallest Panel:
36 ft 9 in (11.20 m)
Largest Panel:
893 sq ft (83.0 sq m)
Heaviest Panel:
80,000 lbs (36,287 kg)