Panattoni Beltway 8 Corporate Centre Bldg 3

Located in Houston, Texas, the Panattoni Beltway 8 Corporate Centre Building #3 totals 133,000-square-feet and was completed in a mere 186 days (six months).

Tilt-Up was specifically chosen for its use of self-performance concrete as well as the ability to control the quality of the panels. Further, Tilt-Up offered the design team a means for creating a building that is flexible, economic and durable. Fly-by panels, which detach from the building, and exterior walls, which slip into the lobby and the interior floor surface and then slip out into the landscape, blur the boundary between inside and outside. Ribbed panels and a metal panel profile are used as a roof-screen in a seamless transition.

This technique of Tilt-Up construction was utilized in a manner to produce a unique identity for a building set within a business park.

 
Main banner image for Panattoni Beltway 8 Corporate Centre Bldg 3

Project Location

Houston, TX
United States

Project Images

TILT-UP TODAY MAGAZINE / PROJECTS IN THE NEWS

Project Team

General Contractor:
 
Concrete Contractor:
 
Architect:
Powers Brown Architecture
Engineer:
Cardno Haynes Whaley, Inc.
Dayton Superior Corporation
Suppliers:
CMC Construction Services
Dayton Superior Corporation
Photographer(s):

Project Specifics

Project Category:
Office
Building Types:
Finishes:
Features:
Insulation:
Environmental:
Number of Floors:
0
Number of Panels:
68 panels
Tilt-Up Wall Area:
26,173 sq ft (2,431 sq m)
Total Floor Area:
133,000 sq ft (12,356 sq m)
Project Footprint:
66,500 sq ft (6,178 sq m)
Tallest Panel:
38 ft 6 in (11.73 m)
Widest Panel:
30 ft 0 in (9.14 m)
Largest Panel:
1,155 sq ft (107.3 sq m)
Heaviest Panel:
115,500 lbs (52,390 kg)
Tallest Cantilever:
38 ft 6 in (11.73 m)