Tilt-Up Concrete Association | 402 1st Ave SE, Mt. Vernon, Iowa 52314 | Phone: (319) 895-6911 | Member Login | Membership Renewal

 

Projects

Institutional Projects

Selected Tilt-Up projects in the institutional category

Article tools: Coming soon!

Sort by: Project name | State/Province | Floor area

Memorial Herman Cypress Hospital
Cypress, TX|Floor area: 686,554 sq ft
Tags: Institutional2016 TCA awards
Ryder Systems
Miami, FL|Floor area: 380,000 sq ft
Tags: Institutional
Carson Tahoe Hospital
Carson City, NV|Floor area: 363,000 sq ft
Tags: Institutional2007 TCA awardsTCA Top Ten
Memorial Hermann Pearland Hospital
Pearland, TX|Floor area: 269,126 sq ft
Tags: Institutional2016 TCA awards
Torrey Pines Institute For Molecular Studies
Port Saint Lucie, FL|Floor area: 145,767 sq ft
Tags: Institutional
Stadter Medical Center - Unit D
Grand Forks, ND|Floor area: 104,850 sq ft
Tags: Institutional
Muskogee Armed Forces Reserve Center
Muskogee, OK|Floor area: 93,711 sq ft
Tags: Institutional2011 TCA awards
Physicians Office Pavillion at WakeMed North Healthplex
Raleigh, NC|Floor area: 80,000 sq ft
Tags: Institutional2008 TCA awards
Hillside Medical Center
Hanover, PA|Floor area: 80,000 sq ft
Tags: Institutional
The DoSeum - San Antonio's Museum for Kids
San Antonio, TX|Floor area: 65,000 sq ft
Tags: InstitutionalTCA LEED Project
Enterprise Center - Arkansas Research and Technology Park
Fayetteville, AR|Floor area: 60,000 sq ft
Tags: InstitutionalTCA LEED Project
Edificio de Seguridad y Emergencia C5
Silao, Guanajuato|Floor area: 58,516 sq ft
Tags: Institutional2016 TCA awards
EMH Sheffield Medical Building
Sheffield Village, OH|Floor area: 50,400 sq ft
Tags: Institutional2007 TCA awards
The Children's Hospital North Ambulatory Sugerical Center/Clinic
Broomfield, CO|Floor area: 50,000 sq ft
Tags: Institutional2009 TCA awards
Armed Forces Reserve Center at Ft Allen PR
Juana Diaz, PR|Floor area: 48,790 sq ft
Tags: Institutional

< Back | 12 | Next >

About the TCA

Founded in 1986, the Tilt-Up Concrete Association (TCA) strives to improve the quality and acceptance of site-cast Tilt-Up construction, a method in which concrete wall panels are cast on-site and tilted into place. Tilt-Up construction is one of the fastest growing industries in the United States, combining the advantages of reasonable cost with low maintenance, durability, speed of construction and minimal capital investment. At least 10,000 buildings, enclosing more than 650 million square feet, are constructed each year using this construction method.

Follow Us

We use LinkedIn, Twitter and YouTube to disseminate information about the Tilt-Up industry, gain new members and inform developers, owners and architects about the benefits of using Tilt-Up.

Popular Links

The following bookmarks jump to the most popular destinations on this site.