In order to obtain cost efficient buildings, the Washington County School District has been constructing their educational facilities with concrete tilt-up for the past several years. This economical option made for faster construction and a beautiful end product using multiple structural systems: beautiful color integrated Tilt-Up panels, masonry and steel metal panels. Due to the tilt-up method of construction and phasing system, the school remained operational and led to faster overall construction.

This project included three phases: 1. The following was constructed on the old athletic field: three-story classrooms, commons, gymnasium, administrative offices, and media center; 2. 80% of the old building was demolished, and the other 20% was gutted and renovated. Tilt-up panels were were attached to exterior to tie in the new construction with the old; and 3. Demolished vocational building and built new vocational building which included shops, graphic arts department, drafting, ceramics, and woodworking.

This project was not only a challenge to design, but also to build. Concrete tilt-up panels varied greatly in geometry. There were many spandrel and cantilevered panels to accommodate entry ways and large openings. Sandwich panels were used in some locations for exterior walls in areas that required a durable wall surface. Some of these areas were the gymnasium, wrestling room, cabinet shop, and welding shop. Due to the complexity of the panels, an elevation of every concrete tilt-up panel was not only done not only architectural but also structurally. The project included tilt-up panels next to CMU and there was creativity in attaching the tilt-up panels with unseen connections.

Photos

Project Specifics

Project Wall Area
68,000 sq ft
(6,317 sq m)
Project Floor Area
206,000 sq ft
(19,137 sq m)
Project Footprint
153,000 sq ft
(14,214 sq m)
Tallest Panel
36 ft 6 in
(11.13 m)
Widest Panel
34 ft 0 in
(10.36 m)
Heaviest Panel
88,000 lbs
(39,916 kg)
Tallest Cantilever Panel
8 ft 0 in
(2.44 m)
Longest Spandrel Panel
22 ft 6 in
(6.86 m)

Participating TCA Members

HD Supply Construction & Industrial White Cap
Tilt-Up accessories
BHB Consulting Engineers PC
Project engineer

About the TCA

Founded in 1986, the Tilt-Up Concrete Association (TCA) strives to improve the quality and acceptance of site-cast Tilt-Up construction, a method in which concrete wall panels are cast on-site and tilted into place. Tilt-Up construction is one of the fastest growing industries in the United States, combining the advantages of reasonable cost with low maintenance, durability, speed of construction and minimal capital investment. At least 10,000 buildings, enclosing more than 650 million square feet, are constructed each year using this construction method.

Follow Us

We use LinkedIn, Twitter and YouTube to disseminate information about the Tilt-Up industry, gain new members and inform developers, owners and architects about the benefits of using Tilt-Up.

Popular Links

The following bookmarks jump to the most popular destinations on this site.